Klimor MCKT-HPX 1 Скачать руководство пользователя страница 1

KLIMOR

 

OPERATION AND MAINTENANCE MANUAL 

DTR HPX.08 v.8 

PAGE 

GDYNIA 

COMPACT AHU MCKT-HPX 

2014 

1/14 

 

 

KLIMOR S.A, 81-035 Gdynia, ul. B. Krzywoustego 5 
Fax: (+48 58) 783-98-88; Tel.: (+48 58) 783-99-99  
Service – Fax: (+48 58) 783-98-88; Tel.: (+48 58) 783-99-50/51 Mobile: (+48) 510 098 081 

Information in this document is subject to change 

email: 

[email protected]

 – Office 

[email protected]

 – Service 

 

 

 

 

 

COMPACT VENTILATION UNIT 

 WITH HEAT PUMP  

MCKT-HPX 

 
 
 

 

 

 

SERVICE 

Tel.: (+48 58) 783 99 50/51 

Fax: (+48 58) 783 98 88 

Mobile: (+48) 510 098 081 

Email: [email protected] 

 
 
 
 
 

 

 

 

 

GDYNIA, December 2014 

Содержание MCKT-HPX 1

Страница 1: ...Tel 48 58 783 99 99 Service Fax 48 58 783 98 88 Tel 48 58 783 99 50 51 Mobile 48 510 098 081 Information in this document is subject to change email klimor klimor pl Office serwis klimor pl Service CO...

Страница 2: ...T PUMP AT LOW EXTERNAL TEMPERATURES 8 5 CONTROL SYSTEM 8 5 1 DIAGRAM OF THE CONTROL SYSTEM 8 5 2 CONTROL OF STANDARD EQUIPMENT 9 5 2 1 TURNING ON THE AHU 9 5 2 2 DELAYED COOLING SYSTEM PROTECTION 9 5...

Страница 3: ...lation to modernization and improvement of the product 2 TECHNICAL SPECIFICATION AND APPLICATION Compact MCKT HPX AHU is an air supply exhaust unit designed for ventilation with heat recovery in any r...

Страница 4: ...W 2 0 5 2 0 5 2 1 1 Fan voltage Ph V Hz 1 230V 50 1 230V 50 3 230 50 Fan current A 2 2 2 2 2 2 2 2 23 Compressor power con sumption winter kW 1 5 1 6 3 0 3 2 4 3 4 9 Compressor power con sumption summ...

Страница 5: ...plate there are connections hose connectors for draining condensate water from the cross flow heat exchanger and cooler outside the AHU The MCKT HPX AHU is equipped with complete system of power suppl...

Страница 6: ...0 temperatura powietrza po wymianie wynosi t12 h 100 x t2 t1 t1 t12 10 C Jak wida stosuj c HPX powietrze po wymianie nale y podgrza o 12 C podczas gdy bez wymiennika a o 30 C Picture no 4 Determining...

Страница 7: ...at variable air parameters the systems have got wide ranges of permissible operating pressure Filling the system with Freon R407C should be carried out with the compressor operating till the eyehole...

Страница 8: ...order to prevent such situation it is recommended to use the preliminary heater with output dependent on the air flow and estimated temperature of external air The preliminary heater ensures heating...

Страница 9: ...gauges indicate filter contamination with a summary signal 5 2 6 Defrosting the cross flow exchanger If the sensor 12 detects temperature 0 C the air supply fan reduces its output to 20 for 120 secon...

Страница 10: ...final place of operation Loading onto unloading from a means of transport to a warehouse can be carried out manually or with a lift The units should be stored in enclosed roofed places The AHU should...

Страница 11: ...and circulating pump Connect the control panel to the control box with a shielded cable 4x0 5mm 2 max cable length 25m Other electrical elements should be installed in line with guidelines of the Use...

Страница 12: ...13 5 3 19 4 3 400 50 NGE 1 NGE 2 NGE 3 P E 1 x 2 3 0 V T 1 2 T 3 x 4 0 0 V 1 2 3 T T P E 3 x 4 0 0 V 1 2 3 T T P E Picture no 9 NGE heater diagram 11 FIRST START UP The AHU start up can be carried out...

Страница 13: ...f the filters Air flow is too small increase Change the Tz sensor setting Eliminate leakages fill up the R407C Check the valve s coil Cooling instead of heating The 4 way valve is faulty Check the val...

Страница 14: ...ce Fax 48 58 783 98 88 Tel 48 58 783 99 50 51 Mobile 48 510 098 081 Information in this document is subject to change email klimor klimor pl Office serwis klimor pl Service 16 COMMISSIONING PROTOCOL D...

Отзывы: