7.  Operational Use 

Within the scope of maintenance, systematically empty the lower waste bag when it is filled up,  
whereas,  the bag filter needs shaking after certain time - to discard the dusts deposited on the 
internal surface of the filter.  The cartridge is cleaned by striking it around from outside.   
The impurities  (deposited on the internal filter surface)  fall into the waste bag.  The waste bag  
must be emptied when the content of impurities riches the level 20 cm below the bag fastening 
fitting piece.

 

In case the hose got clogged (jammed) 

– lift the stretched hose above 

the

 head of connections  

and shake. 
When to one EGO separator are connected several processing machines 

– shut the slide dam- 

pers at hoses  of the not used machines. This provides a better extraction effect from the other  
(active) processing machines.  

8.  Troubleshooting Guide 

Table No.6 
  Problem 

Possible reason 

Corrective action  

1. 

Sudden noise and vibrations  A larger piece of wood, knot  Disconnect the device from 

 

are occurring 

clipping got jammed between  the power system, remove 

 

 

the impeller blades and the 

the head of connections and 

 

 

housing 

take out the obstacle by hand 

 

 

 

If difficulty, unscrew the  

 

 

 

motor flange, take off the  

 

 

 

motor and impeller and remo- 

 

 

 

ve the object 

2. 

Extraction efficiency is regu- 

A thick layer of dust deposi- 

Shake, strike manually the 

 

larly dropping. 

ted on the internal surface 

bag filter to remove the impu- 

 

 

of the filter 

rities 

3. 

Lack of suction in one of the 

Jam (clogging) in the hose 

Stretch the hose, lift it above 

 

hose branches (connections),    

the connection head and 

 

is occurring. 

 

shake slightly 

4. 

Lowered extraction efficiency  Opposite motor rotation sen-  Change the phase connection 

 

along with the increased noise se 

sequence in the power supply 

5. 

Impurities emerged outside 

1

. The bag filter or waste bag 

1

. Replace the bag filter or 

 

the device 

 

   

 is damaged 

 

   

 the waste bag 

 

 

2

. The connection clamp/hoop 

2

. Tighten up the clamp or 

 

 

 

   

 got released 

 

   

 replace it for a new 

 

Содержание EGO-2

Страница 1: ...EN e mail klimawent klimawent com pl 800O82 EGO 4 W M 11 10 2019 EN www klimawent com pl 800O83 EGO 4 N M 11 10 2019 EN Contents 1 Introductory Remarks 2 2 Application 2 3 Reservations of Producer 2...

Страница 2: ...of the Council with regard to ecodesign requirements for fans driven by motors with an electric input power between 125W and 500 kW Journal of Laws L No 90 of 06 04 2011 Additionally the appliance me...

Страница 3: ...400 1 1 10 83 60 EGO 4W M 3950 2000 3 x 400 1 5 5 85 80 EGO 4N M 4300 1950 3 x 400 1 5 15 85 94 Markings EGO 2W M EGO 4W M equipped with a bag filter EGO 2N M EGO 4N M equipped with a cartridge filter...

Страница 4: ...d a motor with impeller conveying the air with impurities On the motor is placed a motor protective switch with short circuit and overload protection and a power lead cord ended with a plug Underneath...

Страница 5: ...otor For safety reason the fan inlet is protected with a cover to avoid acci dential inserting of the operators hands and to protect the inlet from foreign objects debris that would be drawn into the...

Страница 6: ...e Table No 6 Problem Possible reason Corrective action 1 Sudden noise and vibrations A larger piece of wood knot Disconnect the device from are occurring clipping got jammed between the power system r...

Страница 7: ...shock and from short circuit and overload effects in accordance with the standard of electrical installations in buildings After the completed work leave the separator in the ultimately used position...

Страница 8: ...t and of the Council of 26 February 2014 on the harmonisa tion of the laws of the Member States relating to the making available on the market of electrical equipment de signed for use within certain...

Отзывы: