RADIAL  ROOF  FANS

  BULLET-N                                      31.05.2019 

   

 

 

 

 

 

Fig. No.1  

–  BULLET-N – Structure and dimensions  

 

Table No.6  

–  Dimensions  

Type of the fan 

A

  [mm] 

A1

  [mm] 

B

  [mm] 

C

  [mm 

D

 [mm] 

BULLET-160-N 

194  (6xØ7) 

160 

538 

460 

80 

BULLET-200-N 

224  (8xØ9) 

200 

538 

460 

80 

BULLET-250-N 

274  (8xØ9) 

250 

538 

460 

80 

BULLET-315-N 

344  (8xØ9) 

315 

538 

460 

80 

6.

 

Assembly and Start-up 

BULLET-N are designed for use outside the buildings (outdoor application). It is recommen- 
ded to install them on roof bases or wall brackets (delivery on separate order).  
To reduce more the noise level, apply the sound-absorbing roof bases. 
After the fan is installed on a roof base, all the mounting bolts of the fan flange should be  
screwed up to the roof base (6 or 8 screws M8).  Connection to the power supply ought to 
be carried out by User on one’s own. 

 

 

  Connection to the power supply system has to be carried out  by an au- 

thorized person 

with 

adequate 

qualifications

.

 

Install the IS isolating switch,  to cut off the power supply  during the servicing.  Isolating swi-
tches are in the assortment of KLIMAWENT S.A.  as additional equipment (delivery on sepa- 
rate order).  The switch ought 

should be installed by User on one’s own, in a place as conve- 

nient place.   The way of connection is illustrated in Fig. No.2.  First, take off the fan hood, to  
get access to the terminal box of the fan motor.  After all the connections are carried out, re-
install the fan hood. 
It is important to select the appropriate sort and section of the supply cable and the protection 
from the short-circuit and overload effect, according to the local conditions. 

Check subsequent aspects before the start-up

● 

rated voltage of the system and the motor 

● 

proper and firm connection to the PE protective cable 

● 

application of suitable protection within the power supply system. 

In case  when rotational speed adjustment of the fan is required,  apply the electronic speed go- 
vernor type RP-5-K, delivered by manufacturer upon separate order.  Mode of connection to the 
supply (in version with the speed governor and without the speed governor), is illustrated in the 
Fig. No.2. 

 

Содержание BULLET-160-N

Страница 1: ...3 5 Structure and Function 5 6 Assembly and Start up 6 7 Operational Use 8 8 Trouble Shooting Guide 8 9 Maintenance 8 10 Occupational Health and Safety 9 11 Transport and Storage 9 12 Terms of warran...

Страница 2: ...rective of the European Parliament and of the Council with regard to ecodesign requirements for fans driven by motors with an electric input power between 125W and 500 kW Journal of Laws L No 90 of 06...

Страница 3: ...ure I During operation the maximum impeller rotations should not exceed the nominal rotations J Producer is not responsible for wounds injuries body laceration experienced by User or per sonnel during...

Страница 4: ...4 RADIAL ROOF FANS BULLET N 31 05 2019 Flow chart BULLET 200 N Table No 3 Acoustic pressure level dB A BULLET 200 N outlet inlet 1 m 5 m 10 m 15 m 1 m 63 53 46 43 55 Flow chart BULLET 250 N...

Страница 5: ...e introduced under neath the roof bases TPD N or TPDC N 5 Structure and Function A cylindrical ABS plastic housing contains a radial impeller with a motor The housing is protect ted with a plastic hoo...

Страница 6: ...cut off the power supply during the servicing Isolating swi tches are in the assortment of KLIMAWENT S A as additional equipment delivery on sepa rate order The switch ought should be installed by Us...

Страница 7: ...UTION 1 Overload protection has to be selected by the investor 2 Suggested installing place of the isolating switch near the fan 3 Insulation class I 4 Ingress protection IP44 Fan Motor rate Turbine m...

Страница 8: ...Construction provides operational longevity robustness reliable function under the condition of appropriate operational use To obtain correct function of the fan and to observe the principles of Occup...

Страница 9: ...the PE protective cable Any technical revisions and activities connected with repair have to be executed necessarily after the device disconnection from the power supply system isola ting switch 11 T...

Страница 10: ...ts Journal of Laws L 285 of 31 10 2009 327 2011 EU Guideline of March 30th 2011 on implementing the 2009 125 EC Directive of the European Parlia ment and of the Council with regard to ecodesign requir...

Страница 11: ...11 31 05 2019 RADIAL ROOF FANS BULLET N NOTES...

Страница 12: ...12 RADIAL ROOF FANS BULLET N 31 05 2019 NOTES...

Отзывы: