5.2  Function 

BIG-5000/Ex filtering unit provides separation of the air containing 

dry

 dust fraction.  The dust laden air is guided 

to the chamber of filters.  Here, in the decompression process and because of the flow velocity reduction, larger 
particles  of  dust  are  extracted  into  the  hopper  chamber,  and  subsequently  they  fall  into  the  waste  container. 
Precise dust cleaning proceeds while the air flows through the cartridge filters. In the Fig. No.5 is presented a run 
diagram of the air flow through the filtering unit. As the dust accumulates on the operational surface of the cartridge 
filters,  this  reduces  the  air  flow  intensity.    To  limit  this  disturbance,  the  device  is  equipped  with  a  continuous 
regeneration system of the filters. The impulses of compressed air (directed into the cartridge filters) strike off the 
dust particles. The cleaning air is supplied from the compressed air tank, through the electromagnetic valves that 
are operated by the micro-controller  (in details described in Section No.7). 
In the Fig. No.6 is illustrated a schematic diagram of regeneration of the cartridge filters. 
 

 

 

 

 

 Fig. No.5  Filtration scheme 

 

 Fig. No.6  Scheme of filters regeneration 

 

 

ASSEMBLY  AND  STARTUP 

6.1  Description of mounting 

Before the assembly of the device in the place of use, check if the device is complete, and if it is not damaged, or 
there are indentations, etc.  The appliance is delivered in two assemblies,  so it should be installed by means of 
adequate lifting devices and by a specialised assembly team. 
First,  put the supporting structure with the hopper chamber.  The supporting frame should be levelled and its legs 
fastened  firmly  to the  floor.    Having  installed  the  first  assembly,    put the  chamber  of  filters  (with  the  fixed  to  it 
regeneration chamber) on it. Handle with care, as the assembly is of large dimensions. At the upper part of the 
regeneration  chamber  are  installed  lifting  hooks    (for  lifting  and  positioning  during  the  transport  and  assembly 
activities). 
After the chamber of filters is connected with the supporting structure,  seal up the join surface 

with “silicone” and 

screw it up thoroughly with bolts.  The screws, bolts and “silicone” are delivered by manufacturer along with the 
device. 
The compressed air tank and the electromagnetic valves are delivered to the operator in completely assembled 
state.  Having installed the device, connect it to the external compressed air installation of 0,6 

 0,8 MPa.  The 

pressure air must not contain pollutants, oil and humidity. 

The connection must be equipped with a cut-off valve, air filter and a dewaterer. These elements are not 
delivered along with the device.

 

The nominal diameter of the compressed air connection (for the device of  6 cartridge filters and at the nominal 
diameter of the compress

ed air tank of 8”) should be 1”1/2. 

 

6.2  Start-up

 

Upon  first  operation  of  the  compressed  air  installation  (of  the  device),  check  if  the  connected  part  of  the 
compressed air system is sufficiently cleaned of the metal particles, rust, etc., because the membrane of the ele-
ctromagnetic valves would get damaged. If in the first stage of start-up there is not enough air flow intensity (in 
the system) 

– this means the valves are not tight enough.  Shut the cut-off valve in the supply of the compressed 

air tank.  Wait until the air pressure in the system reaches 0,6 

 0,8 MPa, and then quickly open the cut-off valve. 

The fan chamber with the Ex fan inside 

– is located beyond the device and has to be connected with ventilation 

ducts.  Example of such a connection is illustrated in Fig. No.3. 
Connect the electrical system, power supply and the control units  

–  strictly according to the enclosed Connection 

Diagram Fig. No.7 and 8. As the control system is very complicated,  any activity of device connection/energizing 
must be carried out by an authorised installing team with qualifications. The filtering unit and the fan should be 
connected to the equilibrating grounding profile. 

 

Содержание BIG-5000/Ex

Страница 1: ...ION 4 ASSEMBLY AND STARTUP 6 OPERATIONAL USE 8 TROUBLESHOOTING GUIDE 13 MAINTENANCE AND REPAIR 13 OCCUPATIONAL HEALTH AND SAFETY 14 TRANSPORT AND STORAGE 14 TERMS OF WARRANTY 15 DECLARATION OF CONFORM...

Страница 2: ...afety of machinery Safe distances to prevent hazard zones from being reached by up per and lower limbs EN 60079 0 2013 03 A11 2014 03 Electrical appliances in areas of gas explosion hazard Part 0 Gene...

Страница 3: ...tional use it is important to prevent ignition sources i e sparks cigarette butts embers from getting into the filtering unit 3 3 Operator should wear antistatic clothes while emptying the waste conta...

Страница 4: ...er They have been classified as zone 22 Fig No 2 Classification ATEX internal zones STRUCTURE ADN FUNCTION 5 1 Structure BIG 5000 Ex filtering unit consists of three functional assemblies Regeneration...

Страница 5: ...ils described in separate Use and Maintenance Manual In Fig No 3 is illustrated the filtering unit along with the fan chamber Connection between these two units is an example as applied in the test st...

Страница 6: ...arge dimensions At the upper part of the regeneration chamber are installed lifting hooks for lifting and positioning during the transport and assembly activities After the chamber of filters is conne...

Страница 7: ...n sorts Any activities related to the installing necessarily must be performed by a specialised assembly team after being instructed Having completed the assembly check the conductivity between the su...

Страница 8: ...ned to operate the filtering unit providing automatic regeneration of surfaces of the filters by means of cyclical impulses of compressed air The control system consists of subsequent assemblies switc...

Страница 9: ...Q1M motor protective switch F1 F2 overcurrent disconnectors T1 transformer K1 electromagnetic relay K1T K2T time relays K1M contactor PT resistance relay Fig No 10 Switchgear A1 control unit Fig No 1...

Страница 10: ...from dP not active 0 01 9 99 kPa F13 control with the regeneration process 0 via contact 1 by readout from dP dP converter of the difference of pressures 7 2 1 Description of the displayed messages o...

Страница 11: ...of this function the display shows the dP readout and while the fan is stopped or the pipe conduits are not connected if the dP readout does not have the value 0 00 kPa this can be adjusted with pushb...

Страница 12: ...the door of the switchgear A1 When the alarm occurs it is important to disconnect the power supply by means of the S1 disconnector Next find the fai lure damage find out its their reason and remove t...

Страница 13: ...Dust emerges outside the devi The cartridge filter is not tightly con Replace the cartridge filter or ce nected of damaged improve its mounting The dust is of another sort than stated Contact the manu...

Страница 14: ...system During these activities it is important to wear antistatic clothes While emptying the waste container of the dust during the dismantling of the container and its mounting the waste container mu...

Страница 15: ...d device is indicated in the Card of Warranty The warranty does not comprise mechanical damage and malfunctions caused by User device failures caused during the use which is in contradiction with the...

Страница 16: ...of the European Parliament and of the Council of the 26 February 2014 on the harmo nisation of the laws of the Member States relating to the equipment and protective systems intended for use in potent...

Отзывы: