15
SECTION 2 INSTALLATION
SECTION 2 INSTALLATION
2.1 Preparing for Installation
The purchased product may not include all hardware options referred in this document. This
situation does not constitute an impediment to the electrical installation.
Assembly and related connections of the product, must be implemented by
authorized persons in accordance with the instructions of user manual.
The device must not be put into service if the operator is not sure that all connections
are correctly accomplished.
2.2 Mounting
POWYS 10xx and POWYS 11xx are replaced onto 35mm standart rail.
Before wiring up voltage and current ends to POWYS, you must be sure that the
power is cut.
The product is connected to current transformer(s). Before disconnecting current
transformer leads, be sure that they are short circuited elsewhere or connected to
a parallel load which has sufficiently low impedance. Otherwise dangerously high
voltages will be induced at the current transformer leads. Same phenomena also
apply for putting into service.
2.3 Connection Diagrams
2.3.1 Connections
POWYS 10xx and POWYS 11xx are replaced onto 35mm standart rail.
Содержание POWYS 1012
Страница 1: ...1 USER MANUAL Energy Analyzer...
Страница 4: ...4 SECTION 1 GENERAL INFORMATION Enerji Analiz r...
Страница 14: ...14 SECTION 2 INSTALLATION Energy Analyzer...
Страница 17: ...17 SECTION 2 INSTALLATION 2 4 Dimensions mm Fig 2 3 Dimensions...
Страница 18: ...18 SECTION 3 MENUS Energy Analyzer...
Страница 34: ...34 SECTION 4 RS485 COMMUNICATION Energy Analyzer...
Страница 42: ...42 SECTION 5 FACTORY PREVALUES AND SETT NG RANGES Energy Analyzer...
Страница 47: ...47 SECTION 6 TECHNICAL SPECIFICATIONS Energy Analyzer...