X3-KIT
Installation and Operation Manual
PG 25/40
REV: BETA (4/25/2019)
8.6.
Air Tank - Installation
8.6.1.
Before starting, ensure at least 6 FT. of supplied
¼” Air Tubing is connected to Air Tank front port
, to
allow easily routing across rear firewall/chassis and connecting to Air Compressor.
8.6.2.
Place Air Tank onto Brackets to determine if front Bracket needs to be adjusted (i.e., made level); make
any hand adjustments necessary, remove Air Tank, then
final torque front Bracket
, per figure 10 above.
8.6.3.
Install Air Tank onto Brackets, using
#H5, H7, H9 & H10, as shown below.
NOT
E: Position Air Tank and Brackets, as necessary to maintain a minimum ¼” clearance between
suspension spring and Bracket. It is ok if Air Tank contacts inner plastic fender, or back of Brackets.
Figure 14
–
Installing Air Tank onto Brackets, Exploded View
8.6.4.
Once Air Tank is properly positioned,
final torque all Air Tank bolts and then rear Bracket bolts
, per
figure 11 above.
8.6.5.
Remainder of Air Tank installation will be completed during electrical wiring and Quick Connect routing.
FRONT
H10 (4)
H5 (4)
H9 (4)
H7 (4)