KisanKraft
®
AGRICULTURAL INTER-CULTIVATOR
KK-IC-406D
KK-IC-406D (Electric Start)
This warranty is null & void, if you fail to register the warranty with
KisanKraft by sending the KisanKraft Copy with dealer’s stamp.
: +91.80. 6835 7800
Page 15 of 56
Select the appropriate lubricant
for the diesel
engine according to the environmental temperature.
(See figure 9).
Fill in machine oil when diesel engine is placed level,
and checking the oil level only needs a poke by
dipstick rather than a rotation of dipstick.
Lubricant Oil grade shall be grade CC or CD.
5.
Knock down the lower cover of the air cleaner, refill about 0.1 liter 20# engine oil into
the air cleaner.
Important Note: Do not exceed the mark when refilling.
Connection of Auxiliary Devices & Tools
1.
When Intercultural/Weeding Operations is needed
: Knock down the wheels, fix the
hexagonal union of the Inter-cultivator onto two ends of the hexagonal shaft of the
running part, and axially fix them with M8×55 bolt. Note: Intercultural/Weeding
Operations blades are divided into two groups, namely, the left and the right. Fixing the
blades should guarantee that when the machine is running, the blade edge should work
first. After fixing the blades, also fix the left and right protection board for safety purpose.
Depth of the Intercultural/Weeding Operations can be realized by adjusting height of
the velocity adjustment screw and angles between the lever and the ground (refer to
table 4).
2.
Intercultural/Weeding Operations of paddy field:
When the submerged depth of
human’s feet in the paddy field is less than 25cm, bent blades for wet land can be
directly used for the Intercultural/Weeding Operations of paddy field.
3.
When ditching is needed
: Unlade the Deep Furrowing Resistance
Stick, fix the ditcher, adjust width & height of the ditcher, and then
ditching can be conducted.
•
Width scope of ditching: 14cm-40cm
•
Depth scope of ditching: 11cm-25cm
4.
Short distance transport
: Fix forearm of the wagon box on the trailer and wheels on
the transmission shaft of the running part, the machine can do a transportation job. The
rated load is 250kg, under normal rotated speed of the diesel engine, speed of the fast
shift is about 10 km/h and that of the slow shift is about 5km/h.
5.
Multi-functional working:
Knock down protection
over of the gearbox (No.2 in Figure 1), unscrew the
bolts away from the rear part of the main shaft, and
take the cover for keys out of the shaft. Fasten the
self-contained belt pulley or coupling onto the
gearbox
’s main shaft’s rear part with screws. Type
Hookup, Electric Starter: