EN UG-020 Link 6 user guide r1.0
110
Hardware installation
Link 6 requires installation in the working environment.
Installation involves placing the
where it is going to be performing tasks, placing the
within the constraints of the length of the cable to the arm in an accessible location,
and making sure the robot is installed according to safety guidelines.
Before unpacking, the
should already know the size of the robot from the technical
specifications, have performed a risk assessment, and be familiar with the safety considerations.
Important:
Always place the boxes so that the arrows on the boxes point up to avoid
possible damage to the equipment.
Related topics
Safety directives and warnings
Inside the Link 6 boxes
Link 6 comes in two cardboard boxes. Both boxes are heavy. It is advisable to have two people
carry each box.
The smaller box contains the
, a box with the accessories, and a box with the
. The box with accessories contains the power cord for the controller, as well as all
optional accessories bought with Link 6.
Figure 93: Box with controller, mounting plate, accessories box, and teach pendant box
The larger box contains the
, along with its cable attached to the
of the arm.
+1 514-277-3777
kinovarobotics.com
© 2022 Kinova inc. All rights reserved.
Содержание Link 6
Страница 1: ...Link 6 user guide Optional gripper shown ...
Страница 8: ......