background image

012696  GL0011P-07 

– Installation Guidelines for BioDisc BA, BAx, BB & NB Units 

    Page  13 

4.10.5  Turn on the panel using the isolation switch. It should now be illuminated red. The display should now 

read “- -“. Press the orange reset button next to the display to clear the display. 

4.10.6  Replace the main cover and screws. 

4.10.7  The unit is now fully operational. 

 

 Control Panel Fault Codes & Fuses 

  All fuses are Time Lag HBC 20mm type. 

Ancillary Equipment 

6.1.1 

Ancillary items should be installed in accordance with the Installation Guide supplied e.g. Crude 
Sewage Pump Station /Effluent Pump Station/Effluent Sample Chamber. 

Start Up 

7.1.1 

We recommend that the unit has a Pre-Service Agreement Inspection by an approved engineer.  

7.1.2 

Refer to the Owners Handbook for details of the Start Up Procedure. 

7.1.3 

Once the unit has been installed it should be left filled with water. Please switch on the motor, 
following the procedure in the Owners Handbook and leave the unit running, even if there is no 
sewage being fed into the plant.  

7.1.4 

If the unit has been installed with no operational power supply, then remove the 
motor/gearbox unit and store it in a dry or heated environment until such time as the unit is 
ready for permanent operation. 

7.1.5 

DO NOT CONNECT UNITS WITH INTEGRAL PUMPS TO A SEWAGE SUPPLY, WITHOUT 
ENSURING THAT THE ELECTRICITY IS CONNECTED AND THAT THE UNIT IS OPERATIONAL 
(IF THE MOTOR AND GEARBOX IS FLOODED, REPLACEMENTS WILL BE REQUIRED) 

 

 

 

CODE 

FAULT CONDITION 

FUSE 

Amp 

F1 

No power to the unit 

Customer 

Fuse box 

N/A

 

F2 

The blower pressure has failed (PPFDS kit required) 

N/A 

N/A 

F3 

The high level alarm has activated (where fitted) 

N/A 

N/A 

F4 

The fuse to the blower/motor has failed 

F3 

3.15 

F5 

The fuse to the discharge pump (where fitted) has failed 

F1 

5.0 

F6 

The fuse to the chemical dosing pump has failed 

F4 

0.25 

F7 

The fuse to the recirculation pump has failed 

F2 

5.0 

F8 

The loss of rotation alarm has been activated 

N/A 

N/A 

-- 

The unit has had a fault which has now corrected itself 

N/A 

N/A 

Содержание BioDisc BA

Страница 1: ...ical connection or if there is no power available to operate the unit then the motor with gearbox must be removed and stored in a dry environment The motor keeps dry by generating its own heat when op...

Страница 2: ...d recommended Please contact Kingspan for details of your local service provider Should you wish to inspect the operation of the equipment please observe all necessary precautions including those list...

Страница 3: ...shire HP22 5EW United Kingdom 07 EN 12566 3 BA BF BioDisc Hydraulic daily load 1 2m day 10m day Material GRP Glass Reinforced Plastic Watertightness water test Pass Structural Calculation Pass Treatme...

Страница 4: ...4 2 Mounting Frame Installation where applicable 10 4 3 Installation of Control Panel 10 4 4 Installation of Integral Discharge Pump where applicable 11 4 5 Installation of Sludge Return Pump where ap...

Страница 5: ...owing points should be considered before installation of the equipment 1 3 2 The discharge must have the consent of the relevant Environmental Regulator 1 3 3 The installation should have Planning and...

Страница 6: ...table selection of the cable is the responsibility of the installing electrician Full Load Current Amps BA BAx BB NB Motor 240 volt single phase 0 52 0 52 0 52 0 52 415 volt three phase 0 22 0 22 0 22...

Страница 7: ...of the unit contains this copy of the Installation Guidelines and a cover key 2 2 2 Excavate a hole of sufficient length and width to accommodate the unit and a minimum of 150mm concrete surround and...

Страница 8: ...red Cable supply to control panel Customer Supply Inlet Pipe Outlet Effluent to Soakaway Ditch Stream etc via Sample Chamber if fitted Control Panel Refer to Section 6 for position G L 450mm Inlet Inv...

Страница 9: ...l as described in Section 3 2 4 6 Continue to back fill with concrete wet site or free flowing granular material dry site up to ground level The finished surface should be 95 mm minimum lower than the...

Страница 10: ...et 4 2 2 Allow 350mm minimum clearance from finished ground level to the bottom of the panel 4 3 Installation of Control Panel Figure 1 Control Panel 4 3 1 Remove the four screws on the front of the p...

Страница 11: ...applicable 4 5 1 Using a suitable M20 gland feed the integral discharge pump power cable through Gland Hole 3 Figure 1 and terminate to connection 3 4 TB2 following the guide on Table 2 4 5 2 Set the...

Страница 12: ...crewdriver push switch 10 to the ON position 4 8 Installation of High Level Alarm where applicable 4 8 1 Remove the link in the terminal blocks between connections 11 12 TB6 before inserting cables Us...

Страница 13: ...owing the procedure in the Owners Handbook and leave the unit running even if there is no sewage being fed into the plant 7 1 4 If the unit has been installed with no operational power supply then rem...

Отзывы: