Fixed Angle Ground Mount Installation Guide

 

Revised Aug-2020 

©2020 All Rights Reserved

 

Step 1B: Place A-Frames 

a.

 

Determine the model of ground mount that you are installing.  If you are 

using the 

High Wind Ground Mount

, the length of the cross bracing will 

be 131.45”, if you are using the 

Standard Ground Mount

 model the cross 

bracing will be 170.6” 

b.

 

Position feet on foundation – See Appendix 2 Spacing Guidelines and 

Appendix 3 Foot Detail 

i.

 

Spacing between A-Frames is 124.5” if using the 

High Wind

 

Ground Mount

 and 165.17” if using the 

Standard Ground Mount 

ii.

 

Spacing between front and rear feet is 91.98” 

c.

 

Establish the highest point (ballast or ground screw) where an A-Frame 

foot will be located. This will be known as the datum foot. Once the 

position is confirmed for all feet fasten them in place (Hardware not 

included) 

 

 

 

 

 

Datum 

Foot Location 

Ballast or Ground 

Screw 

Содержание KLGM

Страница 1: ...Fixed Angle Ground Mount Installation Guide High Wind Fixed Angle and Fixed Angle Ground Mount Installation Guide KLGM G KRGM G April 2020 Revision...

Страница 2: ...d Aug 2020 2020 All Rights Reserved Product Certifications SBWK 312 WEEB M KR CL501TN The above products are tested to UL 467 CAN CSA C22 2 No 41 US Can safety standards for safety grounding and bondi...

Страница 3: ...ith the instructions detailed in this manual including handling solar modules solar racking or system installation Before attempting to install operate or service a Kinetic Solar system all instructio...

Страница 4: ...CERTIFICATIONS 2 DISCLAIMER 3 GENERAL NOTES 5 TOOLS REQUIRED 6 MAIN COMPONENTS 6 MOUNTING PROCEDURE 7 Step 1A Pre Assemble A Frames 7 Step 1B Place A Frames 9 Step 2 Attach cross bracing 11 Step 3 Se...

Страница 5: ...ulation inside holes or along edges This is normal Bolts hardware can be lightly tapped through the holes to clear the buildup Alternatively they can be cleaned up with a drill so long as the Zinc is...

Страница 6: ...nd Mount Installation Guide 6 Revised Aug 2020 2020 All Rights Reserved Tools required Main components Measuring Tape Chalk String Line Impact Wrench 1 2 Wrench 1 2 Socket 9 16 Socket 9 16 Wrench 1 1...

Страница 7: ...de 7 Revised Aug 2020 2020 All Rights Reserved Mounting Procedure Step 1A Pre Assemble A Frames a Each A Frame consists of the following i Main diagonal member ii Column iii Support Brace iv Connectio...

Страница 8: ...Aug 2020 2020 All Rights Reserved c Attach splice plates using supplied carriage bolts and hardware so that the slots are perpendicular to the main diagonal The location of the plates depends on whet...

Страница 9: ...u are using the Standard Ground Mount model the cross bracing will be 170 6 b Position feet on foundation See Appendix 2 Spacing Guidelines and Appendix 3 Foot Detail i Spacing between A Frames is 124...

Страница 10: ...rial Institutional Fixed Angle Ground Mount Installation Guide 10 Revised Aug 2020 2020 All Rights Reserved d Place the assembled A Frame on top of the feet with the hex nut and flat washer pre instal...

Страница 11: ...0 2020 All Rights Reserved Step 2 Attach cross bracing a Mount cross bracing to A frames iii If the A frame is in the middle of the array the bolt 5 16 x 3 goes through both pieces of cross bracing iv...

Страница 12: ...2020 2020 All Rights Reserved Step 3 Secure Structure a The front and rear feet should look as shown Do not fully torque hardware until all of the feet have been determined to be level b Fully torque...

Страница 13: ...plice plates that have been installed on the A Frames Hat rails always attach to the innermost set of holes of the splice plate b The splice plates have slots to accommodate the hat rail in order to p...

Страница 14: ...l Industrial Institutional Fixed Angle Ground Mount Installation Guide 14 Revised Aug 2020 2020 All Rights Reserved Step 5 Final Tighten and Torque a Systematically tighten and torque all of the bolts...

Страница 15: ...Angle Ground Mount Installation Guide 15 Revised Aug 2020 2020 All Rights Reserved Step 6 Mount Modules a Insert the end clamps at the end of each rail by inserting the bent end of the nut into the la...

Страница 16: ...eth into the correct spot and reassemble b Position modules on top of rails in desired position c Insert mid clamps by sliding or lifting edge of module and inserting in a similar fashion to the end c...

Страница 17: ...solar com 1 416 665 3755 Commercial Residential Industrial Institutional Fixed Angle Ground Mount Installation Guide 17 Revised Aug 2020 2020 All Rights Reserved Appendix 2 Spacing Guidelines See next...

Страница 18: ...1 www Kineticsolar com 1 416 665 3755 Commercial Residential Industrial Institutional Fixed Angle Ground Mount Installation Guide 18 Revised Aug 2020 2020 All Rights Reserved See previous page for Hig...

Страница 19: ...artin Ross Ave Unit 1 www Kineticsolar com 1 416 665 3755 Commercial Residential Industrial Institutional Fixed Angle Ground Mount Installation Guide 19 Revised Aug 2020 2020 All Rights Reserved Appen...

Страница 20: ...c Solar 65 Martin Ross Ave Unit 1 www Kineticsolar com 1 416 665 3755 Commercial Residential Industrial Institutional Fixed Angle Ground Mount Installation Guide 20 Revised Aug 2020 2020 All Rights Re...

Отзывы: