
86
TOS3200
Starting the Test
Power supply to the EUT during the interval time (LINE BRK
(AUTO))
Sets whether or not to supply power to the EUT during program test interval time.
On SYSTEM1/5, press the LINE BRK (AUTO; SHIFT+F4) to select ON or OFF.
Starting the Test
Starting the test
1
Check that the TOS3200 is connected correctly to the EUT.
2
On AUTO1/2 with “READY” displayed, press the START switch.
When a test starts
See
ON
Does not supply power to the EUT during the interval time
OFF
Supplies power to the EUT during the interval time
• Even if you set LINE BRK (AUTO) to OFF, when the EUT power supply switches from a
positive phase connection to a negative phase connection between steps, the TOS3200
does not supply power to the EUT. The only way that you can switch the connection is by
shutting off the power supply.
• If you set LINE BRK (AUTO) to OFF and PROBE to EncLiv or EncNeu, the TOS3200 does
not perform earthing checks. See
for details.
WARNING
Electric shock may occur. Do not touch the tip
of the lead while using the test lead.
AUTO 1 / 2
00 TC•E
NC
P
E
––P
NRM
•NORM––– HOL
01 PCC––––––P
NRM
•NORM––– 1s
–––END
PRG
01:TEST-1
TOTAL: 2
READY
START
Check the READY
indication and press
the START switch.
If LINE BRK (AUTO) is set to ON, the DANGER lamp and the LINE ON LED do not illumi-
nate during the interval time.
Содержание TOS3200
Страница 15: ...General Description This chapter gives an overview and describes the features...
Страница 20: ...20 TOS3200 Options This page has been intentionally left blank...
Страница 29: ...Panel Control Basics This chapter explains how to select items on the screen and how to enter values...
Страница 38: ...38 TOS3200 Panel Memory This page has been intentionally left blank...
Страница 67: ...Meter Mode Measurement This chapter explains the touch current measurement in Meter Mode Meter Mode Measurement...
Страница 73: ...Program Test This chapter describes how to create and edit sequence pro grams and how to execute the test...
Страница 105: ...Specifications This chapter gives the specifications and external dimensions...
Страница 115: ...Appendix A A List of Default Settings B System Settings C Protection Function D Troubleshooting...
Страница 129: ......