KIKUSUI Electronics Corp.
326
Power line abnormality simulations (SIMulation)
The SIMulation group is used to perform power line abnormality simulations.
■
Configuring parameters
First, configure the parameters.
SIMulation:T1:PHASe:STATe OFF 'Sets T1 using time
SIMulation:T5:CYCLe:STATe OFF 'Sets T5 using time
SIMulation:T1:TIME 5MS 'Sets the voltage regulation starting time
SIMulation:T2:TIME 10000MS 'Sets slope time 1
SIMulation:T3:TIME 100MS 'Sets the voltage regulation time
SIMulation:T3:VOLTage 50V 'Sets the regulated voltage
SIMulation:T4:TIME 10000MS 'Sets slope time 2
SIMulation:T5:TIME 10000MS 'Sets the return time
Next, set the number of repetitions.
SIMulation:REPeat:COUNt 5 'Sets the number of repetitions
After you have finished configuring the settings, execute the power line abnormality
simulation.
■
Execute power line abnormality simulations.
Send the following command to execute a power line abnormality simulation.
OUTP ON
SIM:STAT RUN
You can query the execution status of power line abnormality simulations.
SIM:EXEC?
If the execution has been stopped, "STOP" is returned. If the sequence is being exe-
cuted, "RUN" and the present repetition number is returned.
To stop a power line abnormality simulation that is being executed, send the following
command.
SIM:STAT STOP
You can use triggers to execute power line abnormality simulations.
Execution using triggers
You can use triggers to synchronize power line abnormality simulations by using the