A-16
PAT-T 4kW
A.6
Tutorial
This section describes the procedures to make measurements through remote
control on the PAT.
A.6.1
Turning the Power On and Resetting the Instrument
When the PAT is turned on, all panel settings are set to the state when it was turned
off the last time. The output state varies depending on the output state setting
(OUTPut:PON:STATe) at power-on.
There are settings specific to remote control that are not related to the panel settings.
They are the SYSTem, TRIGger, and STATus subsystems. Most of the settings are
reset when the PAT is turned on. The following commands are implicitly executed at
power-on.
*CLS
*SRE 0
*ESE 0
:SYSTem:REMote
:SYSTem:PRESet
:OUTPut OFF
' OUTP
u
t O
N
is exec
u
ted if OUTP:PO
N
:STAT is
' set to AUTO.
:OUTPut:PROTection:CLEar
:TRIGger:SEQuence1:SOURce BUS
:TRIGger:SEQuence2:SOURce BUS
:TRIGger:SEQuence3:SOURce IMMediate
:INITiate:CONTinuous:SEQuence3 OFF
Reset command
The *RST command is used to initialize the panel settings of the PAT.
*RST
The *RST command is used to reset the panel settings to their default conditions.
However, some items are not affected by the *RST command.
If you want to completely reset the panel settings, the items below must be changed
to the initial settings after executing the *RST command.
•
Communication error display setting
•
Master-Slave parallel operation setting
•
Lock function
•
Remote interface setting
•
Turning on the POWER switch while holding down the SHIFT key initializes the
PAT settings to factory default. All the panel settings, panel memory contents,
and configuration settings are reset.
See
Содержание PAT160-25T
Страница 17: ...General Description This chapter describes an overview and describes the features...
Страница 22: ...1 6 PAT T 4kW...
Страница 34: ...2 12 PAT T 4kW...
Страница 73: ...External Control This chapter describes external analog control and remote monitoring using the J1 connector...
Страница 106: ...6 12 PAT T 4kW...
Страница 158: ...7 52 PAT T 4KW...
Страница 159: ...Maintenance This chapter describes maintenance such as cleaning inspecting and calibrating...
Страница 171: ...Specifications This chapter describes the specifications and gives the dimensions of the PAT...