
KHA1000
2-17
2
In
sta
lla
tio
n
a
n
d
P
re
p
ara
tio
n
fo
r U
se
Fig.2-9
Switch or circuit breaker to be used for direct connection
to commercial power supply (AC line)
1.
Turn off the switches on the switchboard.
2.
Connect the grounding terminal on the switchboard to G of the
SOURCE terminal.
The customer is required to obtain an installation wire. Select the rated current of the
wire according to the input current of the EUT.
3.
As shown in Fig. 2-9, install the switch or circuit breaker between the
SOURCE terminal and the commercial power supply (AC line).
Match the polarities (L, N, and G) of the terminal and switchboard to each other. The
customer is requested to prepare the switch or circuit breaker and wires.
Turn on the switches on the switchboard and installed switch or circuit breaker
immediately before starting a test.
L
N
G
EUT
G N L
G N L
Voltage sensing terminal
External signal
input terminal
LOAD terminal
S
OURCE terminal
To switches on switchboard
S
witch or circuit breaker
See
Содержание KHA1000
Страница 1: ...Part No Z1 003 482 I0043901 Oct 2021 Operation Manual Harmonic Flicker Analyzer KHA1000 ...
Страница 8: ...vi KHA1000 ...
Страница 20: ...xviii KHA1000 Rear panel 1 2 3 4 5 6 7 8 9 10 11 12 13 14 ...
Страница 22: ...xx KHA1000 ...
Страница 23: ...Overview This chapter provides an overview of the product and explains its features 1 ...
Страница 30: ...1 8 KHA1000 ...
Страница 68: ...3 20 KHA1000 ...
Страница 69: ...Basic Operation This chapter explains basic operation methods 4 ...
Страница 156: ...5 54 KHA1000 ...
Страница 183: ...Other Measurements This chapter explains measurements for other than harmonic current and voltage fluctuation tests 7 ...
Страница 193: ...Remote Control This chapter explains how to connect the remote interface and how to control it using SCPI commands 8 ...
Страница 260: ...9 6 KHA1000 ...
Страница 261: ...Specifications This chapter explains the specifications of this product 10 ...
Страница 272: ...I 4 KHA1000 ...
Страница 273: ......