![Kiepe Elektrik DG 10 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/kiepe-elektrik/dg-10/dg-10_operating-instructions-manual_1966506011.webp)
11
DG Operating Instructions
5 Mounting and Dismounting
5
Mounting and Dismounting
5.1
Scope of Supply
The pulse generators are delivered ready for operation.
The fixing nuts (
1
) or the plastic clip (
2
) together with the
weld-on plate (
3
) are included in the scope of supply
.
5.2
Mounting
Danger to life – electric shocks!
The mounting and the electrical connection
may only be carried out by skilled electri-
cians.
De-energize the plant before the mounting.
Prevent unintentional reclosing of the plant.
Cover the adjacent, live parts in a shockproof
way.
5.2.1
General Mounting Instructions
The pulse generators are to be so installed that one or
several metal parts (Fe metals, if possible) can rotate
past the head (
4
) of the pulse generator within the re-
sponse distance
. One pulse is generated
per metal part. Pulse multiplication via symmetrical ar-
rangement of several metal parts is recommended for
low rotational speeds. The metal parts should at least
have the dimension of the head (
4
) of the pulse genera-
tor, and the distance between any two parts should not
be below the double diameter of the pulse generator.
The pulse generator is fastened with two fixing nuts (
1
)
or by means of the enclosed plastic clip (
2
) and the
weld-on plate (
3
)
. The pulse gen-
erators are also suited for a flush fitting. They can be
screwed directly into a thread.
In order not to influence the responsiveness of the pulse
generator, the distance between the head (
4
) of the
pulse generator and the metallic machine parts has to
be at least 24 mm for M 18 pulse generators and 30 mm
for M 30 pulse generators.
Содержание DG 10
Страница 1: ...OPERATING INSTRUCTIONS Pulse Generator Type DG ...
Страница 14: ...14 DG Operating Instructions 6 Ordering Devices ...
Страница 15: ...15 DG Operating Instructions ...