P/N P-047550-1852-EN • REV 009 • ISS 21FEB20 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GSA-IM Isolator Module 
Installation Sheet 

 

Description 

The GSA-IM Isolator Module is an addressable device that protects a 
signaling line circuit (SLC) from a wire-to-wire short. The GSA-IM 
module monitors line voltages and opens the SLC when a short is 
detected, effectively isolating the short between the two isolator 
modules located electrically closest to the short. 

The GSA-IM module requires one detector address on the SLC. 
Addresses are assigned electronically. There are no address switches. 

An LED provides visible indication of the status of the module: 

• 

Normal: Green LED flashes 

Installation 

Install this device in accordance with applicable national and local 
codes, ordinances, and regulations.  

• 

NFPA 72 2013 – A single fault on a pathway connected to the 
addressable devices shall not cause the loss of more than 50 
addressable devices. 

• 

NFPA 72 2016 and later – A single fault on a pathway connected 
to the addressable devices shall not cause the loss of the devices 
in more than one zone. 

Notes 

• 

The module is shipped from the factory as an assembled unit; it 
contains no user-serviceable parts and should not be 
disassembled. 

• 

This module does not operate without electrical power. As fires 
frequently cause power interruption, discuss further safeguards 
with your local fire protection specialist. 

To install the module: 

1.  Write the address assigned to the module on the label provided, 

and then apply the label to the module. Remove the serial number 
label from the module, and then attach it to the project 
documentation. 

2.  Wire the module as shown in Figure 2 on page 2. 

3.  Using the self-tapping screw provided, attach the wall plate to the 

module. See Figure 1. 

4.  Using the four machine screws provided, attach the wall plate and 

module to the electrical box. 

Figure 1: Installation diagram 

 

(1)  Compatible electrical box 
(2)  GSA-IM module 
(3)  Wall plate 

(4)  #6-32 × 5/8 machine screws (4X) 
(5)  #4 × 1/2 self-tapping screw 

Wiring 

Wire this device in accordance with applicable national and local 
codes, ordinances, and regulations. 

Notes 

• 

Refer to the Signature loop controller installation sheet for SLC 
wiring specifications for additional details. 

• 

All wiring is power-limited and supervised. 

To wire the module: 

1.  Verify that all field wiring is free of opens, shorts, and ground 

faults. 

2.  Strip 1/4 in. (about 6 mm) from the ends of all wires that connect to 

the terminal block of the module. 

When stripping wire ends, exposing more wire may cause a 
ground fault; exposing less wire may result in a faulty connection. 

3.  Make all wiring connections as shown in Figure 2. 

Figure 2: Wiring diagram 

 

(1)

(2)

(3)

(4)

(5)

SLC 

SLC 

SLC 

SLC 

Отзывы: