12). Maintenance
➢
The unit is constructed using low maintenance components throughout and should not
require any day to day maintenance. The following is the recommended frequency for
various maintenance tasks.
➢
Other items, such as security of fixings, terminations, plant room mechanisms and
accessories are not specified, but should be carried out as a matter of course, as on any
other piece of equipment.
We recommend the unit is inspected frequently and serviced biannually by a fully trained and
qualified - KGN Pillinger engineer.
Monthly checks:
1. Pumps for leakage and quiet running.
2. Check that the motor(s) run without over heating
3. Check for undue noise or vibrations.
Six monthly checks (in addition to monthly schedule):
1. Ensure the break tank is clean and that the correct water level is maintained.
2. Check that the vessel gas pre charge is at the correct pressure.
Failure to maintain the unit(s) may result in partial or complete
failure and cause damage to property.
Do not touch any live parts for at least 8 minutes after switching
off the power.
The electrical system must be isolated prior to carrying out any
works.