Keysight Y1225A Rack Mount Kit 

Installation

This installation note contains procedures for installing the Y1225A Rack Mount 

Kit for the Keysight M9502A 2-slot AXIe Chassis in a standard EIA rack.

Parts List

The parts included with each rack mount adapter option and the support rail are 

shown in the following table:

General Guidelines

In rack mounting the chassis, follow these guidelines:

1

Always begin installing the chassis and heavy instruments at the bottom of 

the rack and work up. This maintains a lower center of gravity and reduces the 

possibility of the rack tipping.

2

Anti-tipping feet, if available with the rack, should always be extended.

3

The heaviest instrument of chassis should always be mounted at the bottom 

of the rack.

4

For maximum cooling and optimum rack thermal efficiency, place the 

instrument or chassis with the greatest power consumption towards the top of 

the rack. This promotes efficient cooling since heat rises when placed nearer 

to the top of the rack, high power instruments will not unnecessarily heat 

other instruments. However, in doing this, do not violate the guideline that 

the heaviest instruments should be placed at the bottom of the rack.

5

If instruments or modules in the chassis are consuming maximum power, 1U 

of rack space is required for ventilation below the chassis.

Quantity

Description

Part Number

1

Rack Flange Kit

N5650-00020

4

Rack Flange Screws M4x6 Flat Head

N/A

2

Support Rails

M9018-00001

8

Channel Nuts (for support rail-to-rack)

0590-0804

4

Support Rail-to-Rack Screws - 10-32 x 0.5

2680-0278

4

Dress Adapter Screws for rack flanges

E9900-06001

Содержание Y1225A

Страница 1: ...ys be mounted at the bottom of the rack 4 For maximum cooling and optimum rack thermal efficiency place the instrument or chassis with the greatest power consumption towards the top of the rack This promotes efficient cooling since heat rises when placed nearer to the top of the rack high power instruments will not unnecessarily heat other instruments However in doing this do not violate the guide...

Страница 2: ...e See Figure 1 2 Remove the four 2 Phillips screws from each side of both bumpers See Figure 2 3 Using the rack mount flanges as templates position the flanges on the rack s vertical columns where the chassis is to be mounted Align the adapter holes over the center holes of the EIA rack units Slide channel nuts over the rack holes to be used by the rack mount flanges See Figure 3 Figure 1 Removing...

Страница 3: ...taching Channel Nuts One Rack Unit Rack Unit Center Hole Channel Nuts Keysight Y1225A Rack Mount Installation Note 3 Keysight Y1225A Rack Mount Kit Installation 4 Attach the rack mount front handle flanges to the chassis Refer to Figure 4 ...

Страница 4: ...ical columns Use four channel nuts and the four 10 32 x 0 5 support rail to rack pan head screws as shown in Figure 5 8 Set the chassis onto the support rails 9 Slide the M9502A chassis into the rack until the rack mount front handle flanges are against the rack s vertical columns Secure the chassis to the rack using the adapter dress screws INSTALL THE SUPPORT RAILS UPSIDE DOWN IN THE RACK To pro...

Страница 5: ...ote 5 Keysight Y1225A Rack Mount Kit Installation Figure 5 Attaching the Support Rails to the Rack 10 32 x 0 5 screws If the rack will be moved excessively or over long distances you should use a strap to secure the chassis to the rack slides ...

Страница 6: ...This information is subject to change without notice Keysight Technologies 2014 Edition 2 September 2014 Y1225 90001 Y1225 90001 ...

Отзывы: