Self-Test Procedures
Power-on self-test
Each time the power supply is powered on, a set of self-tests are performed.
These tests check that the minimum set of logic and measurement hardware are
functioning properly.
Unit fails self-test
Verify that the correct power-line voltage setting is selected. Also, ensure that all
terminal connections are removed while the self-test is performed. Please refer to
Appendix A: List of Error Codes
Line Voltage Fuse Rating
indicator for U8001A
Line Voltage Fuse Rating
indicator for U8002A
NOTE
The authorised personnel will mark the fuse rating indicator printed on the rear
panel each time the fuse is changed.
Содержание U8001A
Страница 8: ...8 Keysight U8001A U8002A User s and Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 12: ...12 Keysight U8001A U8002A User s and Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 14: ...14 Keysight U8001A U8002A User s and Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 69: ...Service Guide 5 Keysight U8001A U8002A User s and Service Guide 69 Figure 5 4 Graph of load transient response ...