52 Installation Note N5247-90106
Installation Procedure for the Upgrade
-
7. Repeat steps 3-6 to enable Option 419, clicking
419 - Src/Rcvr Atten &
Bias Ts 4-Port
in step 3.
8.
When the installation is complete, click
Exit
.
Option Verification Procedure
Once the analyzer has restarted and the Network Analyzer program is again
running:
1. On the analyzer’s Help menu, click About Network Analyzer.
2. Verify that “P04” and “419” are listed, but “219” is not listed after
“Options:” in the display. Click
OK
.
Step 55. Perform Post-Upgrade Adjustments and Calibration
Adjustments
The following adjustments must be made due to the hardware changes of the
analyzer.
— EE default adjustment
— synthesizer bandwidth adj. (only run when EE default adjust is not
sufficient)
— source adjustment
— IF gain adjustment
— receiver adjustment
— receiver characterization
— IF Response Adjustment (Option 090 Only)
— Noise Adjustment (Option 029 Only)
These adjustments are described in the PNA Service Guide and in the PNA
on-line HELP. A list of equipment required to perform these adjustments is also
found in the service guide.
To view this service guide information, click the Chapter 3 bookmark “Tests
and Adjustments” in the PDF Service Guide
1
.
After the specified adjustments have been performed, the analyzer should
operate and phase lock over its entire frequency range.
If the options have not been enabled or if the option 219 license has not
been removed,perform the prior steps again. If the option is still not
correct, contact Keysight Technologies. Refer to
.
1. See
“Downloading the Online PNA Service Guide” on page 6
.