4-22 Keysight N5227B Service Guide
Troubleshooting
Rear Panel Troubleshooting
4-
Rear Panel Troubleshooting
Each rear panel connector is associated with a hardware group in the analyzer.
You can use the data at these rear panel connectors to help troubleshoot these
hardware groups in addition to testing the connectors.
The connectors discussed in this section are:
— USB x 4
— Monitor (VGA)
— GPIB (0) CONTROLLER
— GPIB (1) TALKER/LISTENER
— LAN
Checking the USB Ports
To verify proper operation of any rear panel USB port:
— Connect a known good USB device, such as a USB mouse.
— Wait 15 seconds for the analyzer to verify the device connection, and then
check the operation of the USB device.
— If the device performs correctly, the USB port is functioning properly.
— If the device does not perform correctly, remove the non-working USB
device, wait 15 seconds, and then reconnect the device to the rear panel
USB port.
— If the USB device still does not work and has been verified to work
elsewhere, then the A21 CPU board is faulty. Refer to
Replacing the A21 CPU Board Assembly” on page 7-26
Checking the CONTROLLER Port
The network analyzer uses a National Instruments 488.2 GPIB controller and
associated driver software. This software includes a test utility that scans the
GPIB bus and returns the status of all the connected peripherals.
To run the test utility software and check the GPIB status:
1.
Connect a known good peripheral to the analyzer using a
known good
GPIB cable.
2.
Press UTILITY
, then
, then
. A
SICL/GPIB/SCPI
dialog box is displayed.
3.
In the
GPIB
block, click
System Controller
to establish the analyzer as a
controller. Wait for the analyzer to configure, and then click
OK
.
System
Configure
SICL/GPIB
...
Содержание N5227B
Страница 26: ...2 8 Keysight N5227B Service Guide General Product Information Keysight Support Services and Assistance 2...
Страница 176: ...5 40 Keysight N5227B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 17 4 Port Receiver Group...
Страница 177: ...Keysight N5227B Service Guide 5 41 Theory of Operation Receiver Group Operation Figure 5 18 2 Port Receiver Group...
Страница 184: ...5 48 Keysight N5227B Service Guide Theory of Operation Power Supply Group Operation 5...
Страница 189: ...Keysight N5227B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure...
Страница 203: ...Keysight N5227B Service Guide 6 19 Replaceable Parts Replaceable Parts Listings Figure 6 6 Top Assemblies All Options...
Страница 217: ...Keysight N5227B Service Guide 6 33 Replaceable Parts Replaceable Parts Listings Figure 6 12 Bottom RF Cables Option 201...
Страница 221: ...Keysight N5227B Service Guide 6 37 Replaceable Parts Replaceable Parts Listings Figure 6 14 Bottom Assemblies Option 205...
Страница 237: ...Keysight N5227B Service Guide 6 53 Replaceable Parts Replaceable Parts Listings Figure 6 21 Bottom RF Cables Option 219...
Страница 241: ...Keysight N5227B Service Guide 6 57 Replaceable Parts Replaceable Parts Listings Figure 6 23 Bottom Assemblies Option 220...
Страница 255: ...Keysight N5227B Service Guide 6 71 Replaceable Parts Replaceable Parts Listings Figure 6 29 Bottom Assemblies Option 401...
Страница 263: ...Keysight N5227B Service Guide 6 79 Replaceable Parts Replaceable Parts Listings Figure 6 32 Bottom Assemblies Option 405...
Страница 267: ...Keysight N5227B Service Guide 6 83 Replaceable Parts Replaceable Parts Listings Figure 6 33 Bottom RF Cables Option 405...
Страница 271: ...Keysight N5227B Service Guide 6 87 Replaceable Parts Replaceable Parts Listings Figure 6 35 Bottom Assemblies Option 410...
Страница 279: ...Keysight N5227B Service Guide 6 95 Replaceable Parts Replaceable Parts Listings Figure 6 38 Bottom Assemblies Option 419...
Страница 318: ...6 134 Keysight N5227B Service Guide Replaceable Parts Replaceable Parts Listings 6...