M9484C Startup Guide
17
Quick Start
Prepare and Power Up the Instrument
Prepare and Power Up the Instrument
1.
Make sure that the line cord is plugged into a grounded outlet to establish
earth ground.
2.
Press the power button to power up the instrument.
3.
Allow the VXG to warm up for at least 30 minutes before using.
Содержание M9484C
Страница 4: ...4 ...
Страница 8: ...8 M9484C Startup Guide ...
Страница 20: ...20 M9484C Startup Guide Quick Start Verify Operation of the Signal Generator ...
Страница 120: ...120 M9484C Startup Guide Using Windows Tools Windows Shortcuts and Miscellaneous Tasks ...
Страница 128: ...128 M9484C Startup Guide Removable Solid State Drive SSD Instrument Security Information ...