Internal Fuse Replacement Procedure
Both internal current path fuses are part number 2110-1402, 11 A, 1000 V, fast acting. To replace an
internal fuse:
1.
Turn off the power and remove all measurement leads and other cables, including the power cord,
from the instrument before continuing.
2.
Follow the
to disassemble the instrument.
3.
Locate the fuse to be replaced, as shown below.
4.
Use the screwdriver to pry the fuse from the fuse holder, being careful not to damage the circuit
board. For the 3 A fuse, it may be easiest to access the fuse from the side, through the rectangular
aperture in the sheet metal.
5.
Remove the fuse.
6.
Position the new fuse in the fuse holder. Push down gently to seat the fuse in the holder.
7.
Re-assemble the instrument completely before connecting any cables or cords.
This concludes the fuse replacement procedure.
Service and Repair
496
Keysight True
volt
Series Operating and Service Guide
Содержание 34460A
Страница 1: ...Operating and Service Guide Keysight Truevolt Series Digital Multimeters ...
Страница 183: ...Measurement Tutorial 184 Keysight Truevolt Series Operating and Service Guide ...
Страница 385: ...STATus Subsystem SCPI Programming Reference 386 Keysight Truevolt Series Operating and Service Guide ...
Страница 541: ...Next Procedure Calibration Adjustment Procedures 542 Keysight Truevolt Series Operating and Service Guide ...
Страница 556: ...Next Procedure Keysight Truevolt Series Operating and Service Guide 557 Calibration Adjustment Procedures ...