U3050BH11
System Setup with N5245A
System Setup with N5245A
Preparing the N5245A Network Analyzer
1.
Remove the feet from the bottom of the network analyzer.
2.
Remove the
two
lower standoffs and screws (0515-1619) from the rear panel on the
network analyzer.
Figure
5
Rear Bottom Feet
3. Install the two rear locking feet (5023-0132) onto the PNA-X, using the included screws
(0515-1619), where the standoffs were removed.
Figure
6
Install Locking Feet on PNA-X
Standoffs (x2)
Feet (x4)
Locking Feet
Screws (0515-1619)
included in package
(5023-0132)
Keysight U3050BH11 User's and Service Guide
9
Содержание U3050BH11
Страница 4: ...Contents 2...
Страница 5: ...U3050BH11 Keysight U3050BH11 User s and Service Guide 1...
Страница 21: ...U3050BH11 Operational Check Figure 13 Keysight U3050BH11 User s and Service Guide 17...
Страница 23: ...U3050BH11 Operational Check Figure 15 Keysight U3050BH11 User s and Service Guide 19...
Страница 25: ...U3050BH11 Operational Check Figure 17 Keysight U3050BH11 User s and Service Guide 21...
Страница 27: ...U3050BH11 Operational Check Figure 19 Keysight U3050BH11 User s and Service Guide 23...
Страница 29: ...U3050BH11 Operational Check Figure 21 Keysight U3050BH11 User s and Service Guide 25...
Страница 31: ...U3050BH11 Operational Check Figure 23 Keysight U3050BH11 User s and Service Guide 27...
Страница 33: ...U3050BH11 Operational Check Figure 25 Keysight U3050BH11 User s and Service Guide 29...
Страница 37: ...U3050BH11 Theory of Operation Figure 27 U3050BH11 Block Diagram Keysight U3050BH11 User s and Service Guide 33...