20
Keysight U3042AM20 User’s and Service Guide
U3042AM20
N5232A RF Interface Cable Connections (U3021-60075)
-
N5232A RF Interface Cable Connections (U3021-60075)
illustrates the cable configuration of the test set to the PNA-L. The
cables have been supplied with the kit (U3021-60075).
Cable Connection Procedure
1.
Remove the SOURCE OUT to CPLR THRU and RCVR IN to CPLR ARM
jumpers (x8) on the analyzer. The RCVR R1 to SOURCE OUT reference loop
jumper (x1) remain on the front panel.
2.
Connect the RF interconnect cables, supplied with this option, from the
PNA-L to the test set. Torque each cable to 8 in-lb. Refer to
Overtorque will cause damage to the test set and may cause the connectors
to spin or become loose.
Table 6
PNA-L Interface Cable Connection (U3021-60075)
Numeric
Order
RF Cables
From: PNA-L
To: Test Set
1
U3042-20182
Port 1 SOURCE OUT
Port 5 SOURCE IN
2
U3042-20183
Port 1 CPLR THRU
Port 5 CPLR THRU
3
U3042-20185
Port 1 CPLR ARM
Port 5 CPLR ARM
4
U3042-20184
Port 1 RCVR A IN
Port 5 RCVR OUT
5
U3042-20189
Port 2 CPLR ARM
Port 6 CPLR ARM
6
U3042-20188
Port 2 RCVR B IN
Port 6 RCVR OUT
7
U3042-20186
Port 2 SOURCE OUT
Port 6 SOURCE IN
8
U3042-20187
Port 2 CPLR THRU
Port 6 CPLR THRU
9
U3042-20191
Port 3 CPLR THRU
Port 7 CPLR THRU
10
U3042-20190
Port 3 SOURCE OUT
Port 7 SOURCE IN
11
U3042-20193
Port 3 CPLR ARM
Port 7 CPLR ARM
12
U3042-20192
Port 3 RCVR C IN
Port 7 RCVR OUT
13
U3042-20197
Port 4 CPLR ARM
Port 8 CPLR ARM
14
U3042-20195
Port 4 CPLR THRU
Port 8 CPLR THRU
15
U3042-20196
Port 4 SOURCE OUT
Port 8 SOURCE IN
16
U3042-20194
Port 4 RCVR D IN
Port 8 RCVR OUT