6 Verify Operation
After connecting AC power cords and powering on equipment, the
following process must be repeated for each M9410A PXIe VXT
Vector Transceiver and its selected X-Apps software pair in the
system; the S9106AC-42D 5G FR1 Multi-port Transceiver
contains four M9410A PXIe VXTs that are labelled on the
Rugged Front Panel as Transceiver 1, Transceiver 2,
Transceiver 3, and Transceiver 4.
6. 3. 2 Verify X-Apps Controls S9106AC-42D RF Ports at 3 GHz
This process verifies operation of
RF Transceiver .380 - 6 GHz
,
RF Out
➀
and
RF In
➁
located on the Rugged Front Panel.
1. On RF Transceiver 1, connect an RF loop-back cable from
RF Out
➀
to
RF In
➁
located on the Rugged Front Panel.
This loop-back cable is not included with the
S9106AC-42D 5G FR1 Multi-port Transceiver.
Use a cable with two adapters (or equivalent) such as:
one 5063-1530 RF Cable, SMA (m) to SMA (m), 152.4 mm (6.0 in) and
two 1250-1250 Adapters, SMA (f) to Type-N (m)
68
S9106AC-2IF, -4UP, and -42D 5G FR1 Multi-port Transceiver Solutions, Startup Guide
Содержание S9106AC-2IF
Страница 6: ...2 S9106AC 2IF 4UP and 42D 5G FR1 Multi port Transceiver Solutions Startup Guide ...
Страница 24: ...20 S9106AC 2IF 4UP and 42D 5G FR1 Multi port Transceiver Solutions Startup Guide ...
Страница 42: ...38 S9106AC 2IF 4UP and 42D 5G FR1 Multi port Transceiver Solutions Startup Guide ...
Страница 56: ...52 S9106AC 2IF 4UP and 42D 5G FR1 Multi port Transceiver Solutions Startup Guide ...