
2 Review Safety Requirements
S9101A 5G Multi-Band Vector Transceiver, Startup Guide
11
2. 9 Location and Mounting
Consider ergonomics when locating any keyboard or mouse which will be used in
connection with an instrument.
Install the S9101A so that the detachable power cords are readily identifiable and is
easily reached by the operator. The detachable power cord is the disconnecting
device. It disconnects the Mains circuits from the Mains supply before other parts of
the S9101A. (The front panel switches are only standby switches and are not LINE
switches.) Alternatively, externally installed switches or circuit breakers (which are
readily identifiable and is easily reached by the operator) may be used as
disconnecting devices.
The S9101A requires a 1U space below when rack mounting.
The S9101RH mmWave Transceiver does not have an AC power connection. It is
powered by a DC voltage supplied over the
RF Cable Assembly to the LO/Pwr/Ctrl/IF In connector. The DC supply does not
represent a risk of personal injury.
The RF Cable Assembly should not be connected to, or
disconnected from, the S9101RH mmWave Transceiver while it is
suppling DC power. This connection should be made only when
powered off.
If the LED status indicator on the front of the S9101RH is lit, this
indicates that it is powered up and the cable should not be
disconnected.
Содержание S9101A
Страница 1: ...Startup Guide S9101A 5G Multi Band Vector Transceiver...
Страница 6: ...2 S9101A 5G Multi Band Vector Transceiver Startup Guide...
Страница 34: ...30 S9101A 5G Multi Band Vector Transceiver Startup Guide...
Страница 42: ...38 S9101A 5G Multi Band Vector Transceiver Startup Guide...
Страница 44: ...40 S9101A 5G Multi Band Vector Transceiver Startup Guide...
Страница 54: ...50 S9101A 5G Multi Band Vector Transceiver Startup Guide...
Страница 97: ...S9101A 5G Multi Band Vector Transceiver Startup Guide 93...