14
Clock Timing (CT) Tests
194
DDR2(+LP) Compliance Testing Methods of Implementation
tAC, DQ Output Access Time from CK/CK# - Test Method of Implementation
The purpose of this test is to verify that the time interval from data output (DQ rising and falling edge)
access time to the nearest rising or falling edge of the clock must be within the conformance limit as
specified in the JEDEC specification.
Signals of Interest
Signal cycle of interest: READ
Mode Supported: DDR2
Signal(s) of Interest:
• Data Signal (supported by Data Strobe Signal)
• Clock Signal (CK as Reference Signal)
Optional signal(s):
• Chip Select Signal (this signal is used to separate DQ signals from different rank of memory.)
Signals required to perform the test on the oscilloscope:
• Data Signal, DQ
• Data Strobe Signal, DQS
• Clock Signal, CK
• Chip Select Signal, CS (optional)
Test Definition Notes from the Specification
Test References
See Table 41 - Timing Parameters by Speed Grade (DDR2-400 and DDR2-533) and Table 42 -
Timing Parameters by Speed Grade (DDR2-667 and DDR2-800) in the
JEDEC Standard JESD79-2E
.
Also see Table 41 - Timing Parameters by Speed Grade (DDR2-1066) in the
JESD208
.
Table 117
Timing Parameters by Speed Grade (DDR2-400 and DDR-533) & (DDR2-667 and DDR2-800)
Parameter
Symbol
DDR2-400
DDR2-533
Units
Specific Notes
Min
Max
Min
Max
DQ output access time from CK/CK
tAC
-600
+600
-500
+500
ps
Parameter
Symbol
DDR2-667
DDR2-800
Units
Specific Notes
Min
Max
Min
Max
DQ output access time from CK/CK
tAC
-450
450
-400
400
ps
40
Table 118
Timing Parameters by Speed Grade (DDR2-1066)
Parameter
Symbol
DDR2-1066
Units
Specific Notes
Min
Max
DQ output access time from CK/CK
tAC
-350
350
ps
35
Содержание D9020DDRC
Страница 1: ...Keysight D9020DDRC DDR2 LP Compliance Test Application Methods of Implementation ...
Страница 10: ...10 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 40: ...1 Installing the DDR2 Compliance Test Application 40 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 46: ...2 Preparing to Take Measurements 30 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 70: ...3 Measurement Clock Tests 54 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 134: ...6 Single Ended Signals VIH VIL Data Mask Tests 118 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 158: ...9 Single Ended Signals Overshoot Undershoot Tests 142 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 186: ...10 Differential Signals AC Input Parameters Tests 170 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 224: ...14 Clock Timing CT Tests 208 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 270: ...15 Data Strobe Timing DST Tests 254 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 342: ...17 Command and Address Timing CAT Tests 326 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 366: ...19 Calibrating the Infiniium Oscilloscope and Probe 350 DDR2 LP Compliance Testing Methods of Implementation ...