
35
2
. Press the
0
°
/
180
°
switch to change the phase and repeat step (
1
).
3
. Change the phase again and repeat step (
1
).
b) Auto Test
Measurements are automatically performed under the Auto Test function in
the following sequence: X
1
/
2
(
0
°
), X
1
/
2
(
180
°
), X
1
(
0
°
),X
1
(
180
°
), X
5
(
0
°
),
X
5
(
180
°
).
1
) Press F
1
to select Auto
2
) Press F
2
& F
3
to select I
Δ
n & RCD type
3
) Press the Test button. The KT
64
will automatically conduct the sequence
as above. When the RCD trips each time reset it.
4
) Return to the tester and the results will be displayed
▲
Be sure to return the tested RCD to the original condition after the test.
▲
When the Uc voltage rises to UL value or greater, the measurement is
automatically suspended and "Uc > UL" is displayed on the LCD.
▲
If " I
Δ
n" setting is greater than the rated residual current of the RCD, the
RCD will trip and "no" may be displayed on LCD.
▲
If a voltage exists between the protective conductor and earth, it may
influence the measurements.
▲
If a voltage exists between neutral and earth, it may influence the
measurements, therefore, the connection between neutral point of the
distribution system and earth should be checked before testing.
▲
If leakage currents flow in the circuit following the RCD, it may influence the
measurements.
▲
The potential fields of other earthing installations may influence the
measurement.
▲
Special conditions of RCDs of a particular design, for example S- type,
should be taken into consideration.
▲
The earth electrode resistance of a measuring circuit with a probe shall not
exceed table
1
(page
10
).
▲
Equipment following the RCD, e.g. capacitors or rotating machinery, may
cause a significant lengthening of the measured trip time.
RCD
Содержание KT64
Страница 1: ......
Страница 44: ...92 1885A 06 11...