9
5. Preparation
5-1. Power On
Operation
Display
Explanation
1. Plug the power cable into this unit
and connect it to outlet.
2. Turn the power switch “ON”, which
is located rear side.
Initial screen will be displayed.
Power cable
Outlet
Power Connector
Power switch
Ground
Note : Approximately one hour before operation, turn the power “On”, and begin warming up the de-
vice.
In case that the screen isn’t show-
ing or is hard too see, adjust the
“Contrast set dial” on the bottom
of unit by turning it until thr screen
is easy to see.
[ ] means, turn [ON]
[
] means, turn [OFF]
[ Measurement
]
[ Application
] 1 Wheat
[ Display
]
[ Adjustment
]
Serial number
[ Time
]
AB01234
[ Communication ]
VER 1 .08
2 0 0 6 − 0 8 − 3 1
1 3 : 5 9
Содержание AN-900
Страница 1: ...Near Infrared Grain Tester AN 900 Ver 1 08 Operating Manual...
Страница 2: ......
Страница 27: ...27...
Страница 28: ...0608 AI 0201 010...