2018-12-18
56 / 74
Front sweeper FKM 60
Maintenance
ENG
7.3 Maintenance
7.3.1 Daily check
Staff:
• Private and commercial operators
Protective gear:
• Protective clothing
• Protective gloves
• Safety goggles
The planning, execution and documentation of tests must be carried out in
consideration of the valid regulations and laws by the operator.
To ensure safe operation of the machine, the safety devices must be checked
regularly.
The following things should be checked daily on the machine:
• Check the safety elements and moving parts for wear before each use.
• Check sweeping roller for wear and replace if necessary.
• Remove wraps of brush elements (such as wire).
• Check the smooth running of the moving parts.
• Clean the device after each use.
• Check the hydraulic connections for leaks before each use.
• Lubricate the grease nipple before use.
• Carry out a test run before each use..
7.3.2 Maintenance after 20 hours of operation / prolonged downtime
DANGER
Danger of life or injury due to a machine in operation!
An operating machine poses a risk of life or injury as well as a risk of material
damage to the machine or system!
•
Before carrying out any maintenance work, disconnect the machine from
the power supply and secure it against being switched on again.
The planning, execution and documentation of tests must be carried out taking
into account the applicable regulations and laws.
To ensure safe operation of the machine, the safety devices must be checked
regularly.
At intervals of no more than 20 operating hours, as well as at the beginning and
end of the season, all moving parts of the unit must be greased or oiled.
Содержание FKM 60
Страница 74: ...2018 12 18 74 74 ENG...