2-6
BHK-MG (OPR) 032816
2.3
SOURCE POWER REQUIREMENTS
BEFORE APPLYING AC SOURCE POWER TO THE POWER SUPPLY, VERIFY THAT THE
LINE VOLTAGE TO BE SUPPLIED MATCHES THE POSITION OF THE AC INPUT SELEC-
TOR SWITCH AT THE REAR PANEL (FACTORY DEFAULT IS 115V).
This power supply operates with the installed circuit breaker from single phase AC mains power
over the specified voltage and frequency ranges without adjustment or modification. The AC
INPUT SELECTOR switch located on the rear panel (Figure 2-2) allows selection of either
115Vac or 230Vac source power.
The nominal AC current absorbed by the BHK-MG Power Supply from the power source is 3.7A
a-c @115V a-c and 1.9A a-c @230V a-c; the power source must be able to deliver the nominal
current as well as surge current ten times larger than nominal.
2.4
COOLING
The power devices used within the power supply are maintained within their operating tempera-
ture range by means of internal heat sink assemblies cooled by an internal (d-c type) cooling
fan.
ALL INLET AND EXHAUST OPENINGS AROUND THE POWER SUPPLY CASE MUST BE
KEPT CLEAR OF OBSTRUCTION TO ENSURE PROPER AIR ENTRY AND EXHAUST.
Periodic cleaning of the power supply interior is recommended. If the power supply is rack
mounted, or installed within a confined space, care must be taken that the ambient temperature,
which is the temperature of the air immediately surrounding the power supply, does not rise
above the specified limits (see Table 1-2).
2.5
PRELIMINARY OPERATIONAL CHECK
BEFORE APPLYING AC SOURCE POWER TO THE POWER SUPPLY, VERIFY THAT THE
LINE VOLTAGE TO BE SUPPLIED MATCHES THE POSITION OF THE AC INPUT SELEC-
TOR SWITCH AT THE REAR PANEL (FACTORY DEFAULT IS 115V).
A simple operational check after unpacking and before equipment installation is advisable to
ascertain whether the power supply has suffered damage resulting from shipping.
Refer to Figures 2-1 and 2-2 for location of operating controls and electrical connections. Tables
2-1 and 3-2 explain the functions of operating controls/indicators and keypad keys, respectively.
1.
With
POWER
switch set to down (OFF) position, connect the power supply to source
power.
2.
With no load connected, set
POWER
switch to the up (ON) position. Each time the unit is
turned on an internal self-test is performed and the power on indications (Figure 2-3) are
visible. If these indications do not appear, the power supply will be inoperative.
WARNING
WARNING
Содержание BHK 1000-0.2MG
Страница 2: ......
Страница 6: ......
Страница 17: ...BHK MG032816 xi FIGURE 1 1 BHK MG SERIES PROGRAMMABLE POWER SUPPLY ...
Страница 18: ...xii BHK MG032816 ...
Страница 24: ...1 6 BHK MG OPR 032816 FIGURE 1 2 BHK SERIES POWER SUPPLY MECHANICAL OUTLINE DRAWING SHEET 1 OF 2 ...
Страница 25: ...BHK MG OPR 032816 1 7 FIGURE 1 2 BHK SERIES POWER SUPPLY MECHANICAL OUTLINE DRAWING SHEET 2 OF 2 ...
Страница 46: ......
Страница 101: ...BHK MG OPR 032816 3 55 FIGURE 3 20 SERIES AUTOMATIC CONFIGURATION ...
Страница 109: ...BHK MG OPR 032816 3 63 FIGURE 3 23 PARALLEL AUTOMATIC CONFIGURATION ...
Страница 114: ...3 68 BHK MG OPR 032816 FIGURE 3 25 PARALLEL MASTER SLAVE CURRENT MODE CONFIGURATION ...
Страница 116: ......
Страница 154: ......