BHK-MG (OPR) 032816
2-1
SECTION 2 - INSTALLATION
2.1
UNPACKING AND INSPECTION
This instrument has been thoroughly inspected and tested prior to packing and is ready for
operation. After careful unpacking, inspect for shipping damage before attempting to operate.
Perform the preliminary operational check as outlined in PAR 2.5. If any indication of damage is
found, file an immediate claim with the responsible transport service.
2.2
TERMINATIONS AND CONTROLS
a). Front Panel: Refer to Figure 2-1 and Table 2-1.
b). Rear Panel: Refer to Figure 2-2 and Table 2-1.
FIGURE 2-1. BHK-MG SERIES, FRONT PANEL CONTROLS, INDICATORS AND CONNECTORS
Содержание BHK 1000-0.2MG
Страница 2: ......
Страница 6: ......
Страница 17: ...BHK MG032816 xi FIGURE 1 1 BHK MG SERIES PROGRAMMABLE POWER SUPPLY ...
Страница 18: ...xii BHK MG032816 ...
Страница 24: ...1 6 BHK MG OPR 032816 FIGURE 1 2 BHK SERIES POWER SUPPLY MECHANICAL OUTLINE DRAWING SHEET 1 OF 2 ...
Страница 25: ...BHK MG OPR 032816 1 7 FIGURE 1 2 BHK SERIES POWER SUPPLY MECHANICAL OUTLINE DRAWING SHEET 2 OF 2 ...
Страница 46: ......
Страница 101: ...BHK MG OPR 032816 3 55 FIGURE 3 20 SERIES AUTOMATIC CONFIGURATION ...
Страница 109: ...BHK MG OPR 032816 3 63 FIGURE 3 23 PARALLEL AUTOMATIC CONFIGURATION ...
Страница 114: ...3 68 BHK MG OPR 032816 FIGURE 3 25 PARALLEL MASTER SLAVE CURRENT MODE CONFIGURATION ...
Страница 116: ......
Страница 154: ......