2.6 Loading filler wire into subfeeder
1.
Straighten the subfeeder cable.
2.
Ensure that the wire feed mechanism pressure arms are closed and correctly adjusted in both, the wire feeder and
the subfeeder.
3.
Press the Wire inch button on the wire feeder or directly on the subfeeder.
The system will automatically load the filler wire to the subfeeder until the wire hits the feed rolls or when the set sub-
feeder cable length plus 0.5 meters has been fed from the wire feeder. If you want to stop the automatic filler wire
feed, press the Wire inch button again.
Flush the system with shielding gas before welding by pressing the Gas test button on the wire feeder or directly on
the subfeeder.