Preparing the Pickup
KM00321,000010E -19-03FEB09-1/1
KM00321,0000373 -19-15OCT10-1/1
Unpacking and First Setup
As soon as packaging material is removed, check the
pickup for any damage that might have been incurred
during transport.
Complete pickup and assemble all options per instructions
delivered with the pickup.
KM1000781
—UN—30MAR12
Set Gauge Wheel Height
Adjust the pickup so that the cylinder teeth are X = 50
mm (2 in.) above the ground.
For proper adjustment see Adjusting Gauge Wheel Height
in Operating the Pickup Section.
A—Gauge wheel
X—50 mm (2 in.)
KM1001240
—UN—22JAN20
25-1
010421
PN=26
Содержание Pickup N3003
Страница 4: ...Introduction 010421 PN 4...
Страница 6: ...Introduction 010421 PN 6...
Страница 67: ...Index Index 3 010421 PN 3...
Страница 68: ...Index Index 4 010421 PN 4...