background image

 

20   installation- storage tank and solar controller 

Kelvinator solar hot water systems

Installation – storage tank  

and solar controller

20mm thermal 

insulation around pipe

The storage tank “flow” connection is to be piped to the 
inlet of the collector array. The outlet of the collector array is 
to be piped to the “return” connection on the storage tank 
and shall have continuous fall back to the storage tank. It 
is recommended that the sensor cable be run at the same 
time as the collector piping for convenience. Ensure that the 
sensor cable is installed neatly, kept out of the way and is not 
in contact with any potentially hot surfaces or copper piping.
If the tank is not to be installed until a later date, ensure that 
the sensor plug is well protected and waterproofed (e.g. put in 
plastic bag and cable tied in a safe location) until final assembly.

Installation of storage tank inlet and outlet connections 

Storage tank inlet connections

isolating 

and non 

return valve

pressure limiting 

valve (600kPa) 

may be required if 

pressure exceeds 

600kPa

pressure relief 

valve (700kPa) may 

be required refer 

to local plumbing 

guidelines

cold 

inlet

to storage 

tank inlet

An isolating and not return valve must be installed on the 
inlet to the hot water system. If it is possible that the supply 
pressure could exceed 600kPa, a pressure limiting valve shall 
also be installed on the inlet piping. A pressure relief valve 
may also need to be installed on the inlet to the hot water 
system under local plumbing requirements. 
If the hot water system is installed in a bad water quality  
area where regular flushing is required due to sediment 
build-up, a drain cock or valve is also to be installed on the 
inlet piping.

On the storage tank return connection install a 1/2" copper 
union, 1/2" nipple and 3/4" to 1/2" reducing bush with 
appropriate thread sealant.

RETURN

storage tank return 

connection

3/4" to 1/2"  

reducing bush

1/2"  

nipple

1/2"  

nipple

Installation of pipe work between the collectors and 
storage tank

The pipe work between the collectors and the hot water 
storage tank is to be made of copper and be a minimum of 
1/2" in diameter. It shall be covered with 20mm thick thermal 
insulation to maintain the efficiency of the system, prevent heat 
loss and to allow the proper operation of the freeze protection. 
Any piping insulation that will be exposed to sunlight must 
also be UV resistant. The copper pipes shall be supported by 
saddles and installed neatly with no sharp bends. The pipes 
shall not exceed the recommended length of 10m (20m total) 
and the height difference between the storage tank and the 
collectors must not be greater than 9 meters. Penetrations 
through the roofing material must be neat, kept as small 
as practical and made at the high point of the roof tile or 
metal sheet. Exposed insulated pipe work between the solar 
collectors and the penetration through the roofing material 
should be kept to a minimum to maintain the aesthetics of the 
installation. The penetrations are to be waterproofed upon 
installation of the pipe work and a boot shall be installed to 
prevent any water from leaking into the premises. 

Содержание KCT45036A

Страница 1: ...Solar Hot Water Systems Installation Manual...

Страница 2: ...d please contact your local authorities for the correct method of disposal warning Contact an authorised installer for installation of this hot water system Contact an authorised service technician fo...

Страница 3: ...insulation may be required to comply with the requirements of AS NZS 3500 4 Plastic pipe MUST NOT be used as it will not withstand the temperature and pressure of the water generated by the solar col...

Страница 4: ...copper fin with TiNOx selective coating Glazing 4mm low iron tempered patterned glass Insulation material 40mm glass wool Collector Evacuated tube KCPE12A Number of evacuated tubes per collector panel...

Страница 5: ...pump type UP15 14B Circulation pump power 25W Rated voltage of circulation pump AC 220 240V Frequency 50Hz Model number KCT27000A KCT27036A KCT34000A KCT34036A KCT45036A Diameter mm 648 648 730 Height...

Страница 6: ...the National Plumbing Standard AS NZS 3500 4 and local authority requirements Ensure the roof structure is suitable to carry the full weight of the solar collectors Each flat panel solar collector and...

Страница 7: ...implement a water pre treatment process to bring the water quality to within acceptable limits to support the installation The saturation index SI is a measure of the corrosive or scaling properties...

Страница 8: ...mm for three solar collectors If the roof material is uneven where the collectors are to be installed then it may be necessary to add an additional 10 mm to the above distances for each collector Spac...

Страница 9: ...16 1 evacuated tube collector 17 1 connector evacuated tube collector 18 2 connector sleeve support evacuated tube collector 19 2 connector to 1 2 male for evacuated tube collector Supplied in kit KK...

Страница 10: ...one for the bottom and are supplied in the mounting kit s solarcollectors collector manifold pipes compression union Slide the fittings onto one side of the collector manifold pipe to be joined and t...

Страница 11: ...Ensure the vent valve is installed so that its vent is pointing directly upwards perpendicular to the ground not the roof ventvalve 1 2 femaleto copperunion sensorpocket 1 2 maleto collectorunion 1 2...

Страница 12: ...ulations including AS3500 plumbing and drainage requirements and AS3000 electrical wiring standards Bottom rail connection viewed from above 10 15mm fromhorizontal bottomrail assembly 1 5m reliefvalve...

Страница 13: ...e with all local regulations including AS5601 gas installation requirements AS3500 plumbing and drainage requirements and AS3000 electrical wiring standards Bottom rail connection viewed from above 10...

Страница 14: ...to the manifold pipes of each collector Slide the fittings onto one side of the manifold pipe to be joined and then push both collectors together The collector manifold pipes shall be inserted as far...

Страница 15: ...top brackets to the roof strut by either using an existing roofing screw or adding a new one Fix the top brackets to each side of the collector array with the supplied self tapping screws If installin...

Страница 16: ...ealing the copper olive to the collector manifold pipes collector 1 2 male compression union Open the fittings kit KKSSURA and check that all components have been supplied see components list Since th...

Страница 17: ...Bottom rail connection viewed from above 10 15mm fromhorizontal bottomrail assembly 1 5m reliefvalve uncontrolled hotwater outlet kitchen laundry tempered 50 C hot wateroutlet bathrooms tempering valv...

Страница 18: ...umbing and drainage requirements and AS3000 electrical wiring standards Bottom rail connection viewed from above 10 15mm fromhorizontal bottomrail assembly reliefvalve uncontrolled hotwateroutlet kitc...

Страница 19: ...m mounting surface to spread its load The storage tank shall be checked with a spirit level to ensure it is level for a number of reasons to ensure the correct positioning of the anode inside the tank...

Страница 20: ...t water system under local plumbing requirements If the hot water system is installed in a bad water quality area where regular flushing is required due to sediment build up a drain cock or valve is a...

Страница 21: ...e g bathroom or ensuite fixtures The water supplying these fixtures shall not exceed 50 C as required by AS 3500 4 heat trap uncontrolled hot water outlet kitchen laundry tempered hot water outlet 50...

Страница 22: ...sensors should not be run alongside power supply cables as this may induce a false signal into the sensor cable Installing the collector array temperature sensor The collector sensor cable is provide...

Страница 23: ...ng rules the local electrical authority regulations and any other applicable standards The pipe work storage tank and collectors are to be properly connected to the earthing system of the premises in...

Страница 24: ...f the storage tank be completed first before the cable is wired to the switchboard If you are replacing an existing electric hot water system and re using the existing cable ensure that the power supp...

Страница 25: ...ing the hot water system with water and checking for leaks At this stage the power to the tank element and pump station should be isolated off Fully open the cold water isolation valve located on the...

Страница 26: ...that the temperature sensors are installed correctly connected to the solar controller and that the cables have not been damaged If the red LED is emitting continuous flashes this indicates that wate...

Страница 27: ...e the isolation valve on the inlet piping Drain the water out of the system by activating the relief valve Remove the flow sensor from the circuit and re connect the collector array piping leaving the...

Страница 28: ...with a thermometer if the water temperature in the bathroom is over 50 C if so the tempering valve may have an incorrect setting or be malfunctioning Please call a service technician Water is dischar...

Страница 29: ...Kelvinator solar hot water systems notes 29 Notes...

Страница 30: ...30 notes Kelvinator solar hot water systems Notes...

Страница 31: ...sported at the owner s cost and risk while in transit to and from Electrolux or its ASC 6 Proof of purchase is required before you can make a claim under this warranty 7 You may not make a claim under...

Страница 32: ...er information about Kelvinator appliances please visit your retailer phone or email our Customer Care team or visit our website telephone 1300 363 640 fax 1800 350 067 email customercare electrolux c...

Отзывы: