6
D
EF
LA
TI
N
G Y
O
UR A
IR
B
ED
5.
When bed is full and has reached desired firmness, close the
valve by turning the pump to the right
(Figure 5A)
. Align the
words “Inflate” on pump with the words “Attach/Detach”
on the socket. You may now remove the pump and store
it while the bed is in use
(Figure 5B).
Figure 4C
Turn the switch to “on.” The bed will now inflate
(Figure 4C)
.
Figure 5A
Figure 5B