Performance Verification
18-5
Test resistor construction
The 1T
Ω
and 10T
Ω
test resistors used to test the 2T
Ω
and 20T
Ω
resistance ranges should be
mounted in a shielded, guarded enclosure like the one shown in Figure 18-1. The resistors
should be properly characterized to the accuracy stated in Table 18-1 before use. Connect the
resistors terminals to the triax jack center conductor and outer shell. Connect the guard shield
to the triax jack inner ring.
WARNING
To avoid a shock hazard, do not connect guard to an exposed shield.
Veri
fi
cation limits
Most of the veri
fi
cation reading limits stated in this section have been calculated using only
the Model 6430 one-year accuracy speci
fi
cations, and most reading limits do not include test
equipment uncertainty. (However, 1pA-100nA and 2G
Ω
-200G
Ω
range limits do include the
uncertainty of the Model 5156 Electrometer Calibration Standard.) If a particular measurement
falls outside the allowable range, recalculate new limits based both on Model 6430 speci
fi
ca-
tions and corresponding test equipment speci
fi
cations.
Example limits calculation
As an example of how veri
fi
cation limits are calculated, assume you are testing the 20V DC
source range using a 20V output value. Using the Model 6430 20V range one-year accuracy
speci
fi
cation of ±(0.02% of 2.4mV offset), the calculated output limits are:
Output limits = 20V ± [(20V
×
0.02%) + 2.4mV]
Output limits = 20V ± (0.004 + 0.0024)
Output limits = 20V ± 0.0064V
Output limits = 19.9936V to 20.0064V
Center
Conductor
Triax Jack
Inner Ring
Shell
Guard
Shield
1T
Ω
or 10T
Ω
Resistor
Figure 18-1
Test resistor
construction
Содержание 6430
Страница 26: ......
Страница 32: ......
Страница 78: ...2 14 Connections ...
Страница 98: ...3 20 Basic Source Measure Operation ...
Страница 138: ...5 30 Source Measure Concepts ...
Страница 156: ...6 18 Range Digits Speed and Filters ...
Страница 168: ...7 12 Relative and Math ...
Страница 176: ...8 8 Data Store ...
Страница 202: ...9 26 Sweep Operation ...
Страница 248: ...11 22 Limit Testing ...
Страница 310: ...16 6 SCPI Signal Oriented Measurement Commands ...
Страница 418: ...17 108 SCPI Command Reference ...
Страница 450: ...18 32 Performance Verification ...
Страница 477: ...A Specifications ...
Страница 489: ...B StatusandErrorMessages ...
Страница 498: ...B 10 Status and Error Messages ...
Страница 499: ...C DataFlow ...
Страница 503: ...D IEEE 488BusOverview ...
Страница 518: ...D 16 IEEE 488 Bus Overview ...
Страница 519: ...E IEEE 488andSCPI ConformanceInformation ...
Страница 523: ...F MeasurementConsiderations ...
Страница 539: ...G GPIB488 1Protocol ...
Страница 557: ......