Before KITE can begin controlling a probe station, the probe station must be properly configured.
The probe station configuration includes:
1. Making test system measurement and communication connections.
2. Creating a probe list using the appropriate prober control software.
3. Loading and aligning the wafer.
Helpful configuration instructions for each supported prober are included in the
Using a Probe Station, Appendix G
. Refer to
for additional information. This tutorial uses
a manual probe station, however the probe station configuration is simple, because step 2 can be
omitted. To configure a manual probe station, connect the test system measurement signals to the
probe station as indicated in
, and align the prober to the first subsite (test element
group) in the test sequence.
Open the probesubsites project
Open the probesubsites project from the
File
menu on the KITE toolbar (click
Open Project
). The
project navigator for the probesubsites project is shown in
.
Figure 4-28
Project navigator