B-6
Calibration Reference
:INIT
(:CALibration:PROTected:INITiate)
Purpose
To initiate comprehensive and factory calibration procedures.
Format
:cal:prot:init
Parameter
None
Description
The
:INIT
command enables Model 2015 calibration when performing
these procedures over the bus. This command must be sent to the unit after
sending the
:CODE
command, but before sending any other calibration
command.
NOTE
The
:INIT
command should be sent only once before performing either DC, AC, or
factory calibration. Do not send
:INIT
before each calibration step.
Example
:CAL:PROT:INIT
Initiate calibration.
:LOCK
(:CALibration:PROTected:LOCK)
Purpose
To lock out comprehensive or manufacturing calibration.
Format
:cal:prot:lock
Parameter
None
Description
The
:LOCK
command allows you to lock out both comprehensive and man-
ufacturing calibration after completing those procedures. Thus,
:LOCK
per-
foms the opposite of enabling calibration with the
:CODE
command.
NOTE
To unlock comprehensive calibration, send the
:CODE
command. To unlock manufac-
turing calibration, hold in the SOURCE key while turning on the power.
Example
:CAL:PROT:LOCK
Lock out calibration.
Содержание 2015
Страница 15: ...1 Performance Verification...
Страница 34: ...2 Calibration...
Страница 60: ...3 Routine Maintenance...
Страница 64: ...4 Troubleshooting...
Страница 89: ...5 Disassembly...
Страница 100: ...5 12 Disassembly...
Страница 101: ...6 Replaceable Parts...
Страница 115: ...A Specifications...
Страница 127: ...B Calibration Reference...
Страница 149: ...C Calibration Program...
Страница 158: ...Keithley Instruments Inc 28775 Aurora Road Cleveland Ohio 44139 Printed in the U S A...