5 Startup and Shutdown
This chapter introduces how to start and shut down the device.
5.1 Startup
Step 1
Check whether the PV, battery and grid wiring correct.
Step 2
Switch on the PV DC switch and BAT DC switch. the LED will be on
;
Step 3
Before start the inverter, you should set the inverter function via APP,
Step 4
When the DC and AC supply power normally, the inverter will prepare to start.At first, the inverter
will check the inner parameters and AC grid parameters, if they are in the normal range, 60s later, the
inverter will check the insulation impedance.
Step 5
About 60s, the inverter will generate power normally. LED id always on
;
Step 6
working status can be queried on the APP
----End
5.2 Shutdown
Step 1
Powering off the inverter on the APP.
Step 2
Switch off all switches.
Step 3
Wait for all indicators off.
----End