Left hand rules
Attention!
Programming the left hand group overrides the stored volumes of the other group(s). If you
want different volumes on each group, start by programming the left group (using the left hand
touchpad), then program the other group(s).
Program hot water timer
The left hand touchpad also governs the hot water timer. Programming is similar to dosing the coffee
buttons. Keep the top button (#5) on the left hand touchpad pressed until the upper LEDs of all
touchpads start flashing (about 6 seconds). Briefly press down the hot water lever (see Figure 3 b) to
start water flow. Press briefly again when the desired amount of hot water is reached. The controller
actually stores the amount of seconds between activation and de-activation of the hot water
distribution. Briefly press the top button (#5) again to exit the programming mode.
Start automatic back-flush program
See pa
ragraph “
” on page 19 for complete back-flush procedure
.
The left hand touchpad is also used to start the automatic back-flush program (see also
Table 2).
To start the back-flush program:
1. Switch machine
“OFF”.
2. Press-hold the #4 button on the left touchpad, turn the
mains switch to “NO HEAT” or “ON”.
3. The cleaning program pressurises and de-pressurises all groups simultaneously for 8 times in a
row.
4. As soon as the program has ended, the main controller will return to normal operation (provided
that the mains switch is in position “ON”). It may take a while for the boilers to reach the
programmed temperatures as a lot of cold water has flown into the system during back-flushing.
Note!
The controller incorporates several functions which you may accidently address while trying to
start the automatic back-flush program.
Function
Press when mains switch is turned
from “OFF” to “NO HEAT”
Visual signal
start automatic back-flush
program
button #4 of 1
st
group
no signal
steam boiler fill-up during brewing
possible (
CORRECT
)
button #3 of 1
st
group
LED
5
of
1
st
group
steam boiler fill-up during brewing
not possible (
FALSE
)
button #3 of 1
st
group
LED
3&5
of
1
st
group
engage steam boiler pump
during fill-up (
CORRECT
)
button #1 & #4 of 1
st
group
LED
1&4
of
1
st
group
disengage steam boiler pump
during fill-up (
FALSE
)
button #2 & #4 of 1
st
group
LED
2&4
of
1
st
group
disengage coffee boiler pump
with hot water (
CORRECT
)
button #2 & #3 of 1
st
group
LED
2&3
of
1
st
group
engage coffee boiler pump
with hot water (
FALSE
)
button #1 & #3 of 1
st
group
LED
1&3
of
1
st
group
NB: buttons are numbered from bottom to top, see Table 2.