11
2.4 Wall Mount Installation
Your TonoCare has been supplied with a wall mounting plate,
4 screws and 4 rawlplugs. Follow the instructions below for wall
mounting.
1. Choose carefully the intended location for your TonoCare
docking station with particular consideration to the routing of
the power cable and the patient screening position. Ensure
that the mains plug is accessible at all times, as this is the
primary means of mains power disconnection.
The TonoCare hand unit should not be used in the
proximity of the docking station. The docking station
should not be fixed over live utilities, as the drilling process
could interrupt the utility supply and cause injury. The
recommended height is 1.2m (4 feet).
2. Use the metal plate as a template to mark the position of the
retaining screws with a pencil, holding a spirit level to the
base of the plate to guarantee horizontal alignment.
3. Drill the appropriate size holes following the marks left from
the previous step.
Use extreme caution when operating the drill, following
the instructions provided with the instrument.
4. Insert the rawlplugs in the holes drilled in the previous step,
and fix the metal plate on the wall with the screws provided,
using a PH1 screwdriver.
5. Position the docking station on the wall mounting plate so
the 2 retaining pins on the metal plate slide into the holes in
the rear of the housing, and the plate supports the unit from
below.
6. You may now plug the power cable into the docking station,
and connect it to mains power. The docking station will blink
twice at power up. Once powered, rest the hand unit on the
docking station for charging.
Charge the unit for a minimum of 12 hours before
first use.
Содержание Tonocare
Страница 1: ...Next Next ...