background image

Translation: Marek Kovář 

Gatehouse KkStB type 18/a 1896 – construction´s instruction 

LAS 4003 TT;                            LAS 5003 H0 

 

 

 

 

 

 

 

 

 

The  normalizations  on  railway  started  in  Austria-Hungary  in  19th  century.  Not  only  in  K.k.  Osterrichische 
Staatbahnen  (KkStB),  but  also  in  many  privat  companies.  All  were  standardized  e.g.  passenger  buildings, 
warehouses,  heating  plants,  sheds,  ramps,  water wells,  toilets  and gatehouses.  The  gatehouse  type  18/a was 
approved  by  the  head  office  of  K.k.St.B.  in  Vienna  in  May  1896.  These  gatehouses  were  built  a  lots  in  many 
different places. They  were modified over time. They are not used  today. Many gatehouses  were destroyed or 
rebuilt on recreational resorts. 

Preparatory works:

 

 

First read the instructions carefully and look at all parts of the construction set. Think over 

each step of construction  process  and prepare  all  necessary tools and materials.  Carefully remove  all parts of 
the construction set from the cardboard – including the small bridge and all incisions which are throughout the 
cardboard. Prevent any undesirable breakage by carefully removing any parts that may not have been correctly 
created during the laser-cutting. 

Necessary tools and materials:

 

wooden scantling (1,5x1,5mm for TT or 2x2mm for H0) on the inside stiffeners 

of the corners, tempera´s, alcohol´s and synthetic paints, dispersed and seconds glue, neutral matt lacquer on a 
furniture in a sprey, wire (diameter 1.5mm or 1mm) on the eaves, aluminium foil, knife for modellers, scalpel, 
cutting backplatte, steel rule, eraser, forceps, brushes numer 4-6, sandpaper granularity 320-400.

 

Preliminary  works:

  I  recommend  to  paint  before  building  parts  1,  31,  32  a  16  by  grey  colour;  parts 

2,3,4,5,6,7,8,9,10,11,12,13, 14, 15, 17, 18, 19, 20, 21,22, 23 and 30 bricky colour; the ends of parts 26 and 27, 
edges of parts 28 and 29, parts díly 34, 36, 38, 41 and 42 in brown (or green) colour. Paint the parts 33, 35, 37 
and 40 by white colour. Prepare the scantling (for scale TT 1,5mm, H0 2x2mm). The length is the same like the 
length of the roof (Nr.28) – three pieces and roof (Nr.29) – three pieces. Their ends which will stick out, paint in 
the same colour like parts 26 and 27 (spars). 

Preparing areal parts of walls:

 Glue two sill ledges (Nr.13) and window stucco 10 on parts 2. Further glue one 

sill ledge 15 at soil window and window arch on part 3. Also glue the arch 10 under the door. Glue window sill 
ledge 13 and 15, window arches 10 and 12 on part 14. Blank off the window by part 9. Glue fourtimes sill ledges 
13 and fourtimes window arches 10 on part 5. Glue the sill ledge 13 and window arch 10 on part 6. Blank off the 
window by part 9. Glue the door arch 10 on part 7 and the sill ledge 14 and window arch 11 on part 8. 

Отзывы: