background image

 

 

ESMPN8-N2-B 

Quick Start Guide     

 

 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 
 
 
 

Rev 1709 

 

Содержание ESMPN8-N2-B

Страница 1: ...ESMPN8 N2 B Quick Start Guide Rev 1709 ...

Страница 2: ...BC Networks Ltd 2017 Page 2 of 12 Index 1 INTRODUCTION 3 1 1 ESMPN8 N2 B INTRODUCTION 3 1 2 FEATURES 3 1 3 SPECIFICATIONS 3 2 PANEL VIEWS 5 2 1 Front panel view 5 3 DIMENSIONS UNIT mm 7 4 MOUNTING 8 4 1 DIN mounting 8 4 2 Wall mounting 8 4 3 Items for attention 9 4 4 Grounding 9 5 Cable 11 5 1 SFP port 11 ...

Страница 3: ...IP surveillance and industrial networks 1 2 FEATURES Managed industrial switch 8 1000Base FX SFP 2 10GBase FX SFP Support EPRS typical recovery time 30ms with 250 units of connection Support different redundancy protocols and standards STP RSTP MSTP Support SNMPv1 v2c v3 RMON Port base 802 1Q VLAN network management Support IGMP Snooping multicast function Support WEB Telnet SSH Console CLI Suppor...

Страница 4: ...r Redundant Input Power Dual DC inputs 45 57VDC 5 pin screw terminal Power Consumption Max 30W Overload Current Protection Present Reverse polarity protection Present Mechanical Enclosure IP40 Dimension W x D x H 68 mm W x 105 mm D x 146 mm H Weight 0 9Kg Environment Storage Temperature 40 to 85o C 40 to 185o F Operating Temperature 40 to 75o C 40 to 167o F Operating Humidity 5 to 95 Non condensin...

Страница 5: ...nel view 1 12 24VDC power input 2 Alarm output terminal block one is normal open and the other is normal close 3 USB console 4 Grounding screw 5 PWR RUN and Alarm status indication 6 1G SFP ports 1 8 7 10G SFP ports 9 10 WARNING This product MUST be mounted to a well grounded mounting surface such as a metal panel Status indicator LED LED Color Status Description ...

Страница 6: ...un Green On System running lights the system normally solid green Alarm Green On Warning lamp P1 Orange On Power 1 is being supplied Off Power 1 is not being supplied P2 Orange On Power 2 is being supplied Off Power 2 is not being supplied SFP port LINK Green On The corresponding port s link is active ACT Blinking Data is being transmitted ...

Страница 7: ...ESMPN8 N2 B Quick Start Guide ESMPN8 N2 B Quick Start Guide Rev1709 docx www kbcnetworks com Copyright KBC Networks Ltd 2017 Page 7 of 12 3 DIMENSIONS UNIT mm ...

Страница 8: ... ESMPN8 N2 B Quick Start Guide Rev1709 docx www kbcnetworks com Copyright KBC Networks Ltd 2017 Page 8 of 12 4 MOUNTING 4 1 DIN mounting Very simple Press the clamp insert into rail then loosen hand 4 2 Wall mounting Step 1 Step 2 ...

Страница 9: ...n to installing the equipment in an environment compatible with the maximum operating temperature specified by the manufacturer Air Flow Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised Circuit Overloading Consideration should be given to the connection of the equipment to the supply circuit and the e...

Страница 10: ...uide ESMPN8 N2 B Quick Start Guide Rev1709 docx www kbcnetworks com Copyright KBC Networks Ltd 2017 Page 10 of 12 interference EMI Run the ground connection from ground screw to the grounding surface prior to connecting devices ...

Страница 11: ...opyright KBC Networks Ltd 2017 Page 11 of 12 5 Cable 5 1 SFP port SFP port supports both electrical and optical SFP modules Selecting right SFP modules rate MM SM 1 fiber 2 fibers based on application Please notice that 1000M SFP port supports 1000Mbps only and 10G SFP port supports 10Gbps only ...

Страница 12: ...ct your nearest KBC office or dealer KBC Networks Office Contact Information North Latin America USA Phone 1 949 297 4930 Toll free 1 888 366 4276 Email techsupport kbcnetworks com EMEA UK Phone 44 0 1322 312090 Email emeatechsupport kbcnetworks com APAC China Phone 1 86 25 5882 1665 Phone 2 86 25 5882 1656 Email techsupport kbcnetworks com Singapore Phone 65 9747 5123 Email apactechsupport kbcnet...

Отзывы: