A.
Top Part:1pc
B.
Base Part:1pc
C.
Pump:1pc
I
、
Assembly Steps
1. Insert the hose of the top part (A) into the pump
(C), and fix the top part into the base part (B)
correctly. (See PIC 2 )
2. keep the top part steady on the base part.
3. Fill base 1/2 with clean cold water, make sure the
the water cover the pump at least.
4. Connect to power outlet and switch on the power.
5. If the water is stronger or smaller, you can switch
off and adjust the control switch on the hose, then
switch on.
II
、
Daily Maintenance
1. Keep the water fresh and clean at all times.
2. The water level must be checked every time before
use. The pump should be submergd at all times.
3. If long time no use, pls switch off the power and
empty the water in the base, keep it dry.
III
、
Caution:
1. Never use the fountain if the cord is damaged or if
the housing is damaged.
2. Always disconnect the fountain from the electric
power then re-filling the fountain with water.
3. Keep the pump wire from high temperature.
4. Keep out of reach from Children and pets.
5. Pls put the fountain on a steady place when it's
working.
*
Packing List