INSTALLATION MANUAL OPERATION MANUAL
KANNAD 406 AP-H
PAGE 602
JUL 24/2013
• CMM 25-63-05: level 2 CMM, available upon request or on Kannad
Aviation Website.
C. Battery replacement
Battery replacement is mandatory:
• after more than 1 hour of real transmission (cumulated duration);
• before or on the battery expiration date.
Battery available from any Kannad Aviation distributor or dealer.
List of distributor available on our Web site:
Orolia S.A.S.
Z.I. des Cinq Chemins CS10028
56520 GUIDEL - FRANCE
Telephone: +33 (0)2 97 02 49 49 Fax: +33 (0)2 97 65 00 20
E-mail:
Support:
Tel.: +33 (0)2 97 02 49 00
Only original battery pack included in battery kit
(KIT BAT 300, P/N S1820516-99)
supplied by Orolia S.A.S. can be installed.
Orolia S.A.S. refuse all responsibility and invalidate
all warranty should other packs be installed.
Содержание 406 AP-H
Страница 22: ...INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AP H PAGE 8 JUL 24 2013 PAGE INTENTIONALLY LEFT BLANK ...
Страница 32: ...INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AP H PAGE 110 JUL 24 2013 PAGE INTENTIONALLY LEFT BLANK ...
Страница 37: ...INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AP H PAGE 205 JUL 24 2013 Figure 203 Bracket installation ...
Страница 48: ...INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AP H PAGE 402 JUL 24 2013 PAGE INTENTIONALLY LEFT BLANK ...
Страница 50: ...INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AP H PAGE 502 JUL 24 2013 2 Drilling Mask ...
Страница 51: ...INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AP H PAGE 503 JUL 24 2013 3 Wiring ...
Страница 56: ...INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AP H PAGE 508 JUL 24 2013 PAGE INTENTIONALLY LEFT BLANK ...
Страница 59: ......