INSTALLATION MANUAL OPERATION MANUAL INSPECTION LOG
KANNAD 406 AF-COMPACT
PAGE: 611
FEB 01/2008
2. Periodic Inspection Log
Type of inspection :
Periodic
..
Battery change
..
Repair
..
Other
Operations carried out (*) :
Next recommended inspection date : _ _ / _ _ _ _
Next planned battery replacement (mandatory) date : _ _ / _ _ _ _
Date : _ _ / _ _ / _ _ _ _
Service station :
Signature and stamp :
Type of inspection :
Periodic
..
Battery change
..
Repair
..
Other
Operations carried out (*) :
Next recommended inspection date : _ _ / _ _ _ _
Next planned battery replacement (mandatory) date : _ _ / _ _ _ _
Date : _ _ / _ _ / _ _ _ _
Service station :
Signature and stamp :
(*) note complete P/N of replaced components (if battery pack has been changed, also note
Batch Number, Tester Name and Date of Manufacture).
Содержание 406 AF-COMPACT
Страница 2: ......
Страница 61: ...INSTALLATION MANUAL OPERATION MANUAL INSPECTION LOG KANNAD 406 AF COMPACT PAGE 507 FEB 01 2008 7 Wiring ...
Страница 87: ......