
35
POWER HEAD OPERATING INSTRUCTIONS
Drive the Loader to the attachment and couple the attachment
plate onto the attachment. Raise the Power Head slightly and
engage the locking pins fully. Turn the engine off and push the
AUX Control Lever forwards and backwards to release any
hydraulic line pressure. Clean the hydraulic
fi
ttings (QRCs)
and then connect them to connections A & B. (see “Hydraulics
General Description” section).
Removal procedure is the reverse order of the above. Remember
to always reconnect the attachment hoses into one another to
stop dirt entering the hydraulic system, or
fi
t the dust
caps supplied.
Once
fi
tted to the Loader, raise the Power Head high enough to
allow the auger to be positioned into the Power Head’s square
drive shaft. Drive the Power Head forward positioning the drive
into the auger, aligning the locking pin holes.
Insert the locking pins and lock in place.
Ensure that the Power Head is securely attached to the Kanga
Loader Check that the couplings are engaged and check for leaks.
Tighten/repair as required.
Inspect the cutting tips and teeth. Ensure that they are in good
condition and
fi
rmly attached.
Start the auger turning in a clockwise direction by activating the
“AUX” lever downwards. Lower the auger by pushing the “ARM”
lever forward. If the ground is hard the front wheels of the Kanga
Loader will lift off the ground. As the auger cuts into the ground
the arc of the arm travel will move it out of vertical. To keep the
auger vertical, move the Kanga Loader backward or forward
slightly to compensate. Continually clear the hole during digging
by raising the auger up (pull back on the “ARM” lever).
Drill a “trial” hole in a clear area to practice all operations and
to become familiar with the procedure.
Note: Teeth should display slight movement.
Check that bolts securing the pilot are tight.
CAUTION:
Large auger
fi
tting is a 2 person operation.
CAUTION:
Prior to commencing work, read the
Safety
Rules
of this Kanga Loader Manual.
CAUTION:
Prior to commencing any digging operations, check with the Local
Authorities and the land owner that there are no buried services (Power, phone, water,
gas, sewage etc) in the vicinity.
Australia ONLY: Phone 1100 “DIAL BEFORE YOU DIG”
Read the Safety instructions in this Manual.
Keep clear of the auger at all times (4m minimum).
FITTING OF POWER HEAD:
FITTING THE AUGER
PRE - OPERATION CHECK
OPERATING INSTRUCTIONS:
Содержание DW625
Страница 1: ...PW628 DW625 MID RANGE LOADER OPERATORS MANUAL WWW KANGALOADER COM 1300 4 KANGA ...
Страница 2: ...2 ...
Страница 59: ...59 THIS PAGE IS INTENTIONALLY BLANK ...
Страница 64: ...64 DIMENSIONS MID RANGE LOADER ...
Страница 69: ......