![Kampmann Venkon XL UL Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/kampmann/venkon-xl-ul/venkon-xl-ul_assembly-installation-and-operating-instructions_3410644018.webp)
Venkon XL UL
Assembly, installation and operating instructions
18
6.2
Requirements governing the installation site
Only install and assemble the unit if the following conditions are met:
Make sure that the wall/ceiling is sufficiently load-bearing to take the weight of the unit (
).
Make sure that the unit is securely suspended/standing.
Ensure that the airflow can circulate freely.
Provide adequate space for appropriately sized flow and return water connections on site (
).
There is a power supply on site (
Maximum electrical rating values [
If need be, provide a condensation connection with a sufficient gradient on site.
6.3
Minimum clearances
Wall mounting
Ceiling mounting
Minimum distances Size 1-4
Mounting and inspection areas
Mounting area Duct system
Inspection area
Inspection area
* The air outlet area must be completely
unobstructed to ensure unhindered air
circulation! At least 2 inches must be
freely accessible above the cladding in
order to be able to remove the cladding.
Air outlet area*
Содержание Venkon XL UL
Страница 2: ......